In the US market
School districts, colleges and municipalities fund buildings through bonds, state programs and grants, and each source can add its own bidding and documentation rules.
Built for public bids
Schools, colleges and towns buy through formal bids. We read the specification first, then supply steel and submittals that answer it point by point.
Photo
Braced multi-story frames for classrooms, labs and clinic space, with floors ready for composite deck.
Explore →Long-span frames or trusses for column-free floors, checked for drift, ponding and uplift.
Explore →Where ICC 500 applies, the frame is designed to the higher criteria your Engineer of Record sets.
Calculations, shop drawings and a Manufacturing Data Record supplied against the bid’s submittal list.
Explore →School districts, colleges and municipalities fund buildings through bonds, state programs and grants, and each source can add its own bidding and documentation rules.
Large covered space for assembly and athletics, hard-wearing finishes, compliant stairs and walkways, and a document trail that satisfies both the owner and the building official.
Calculations, shop drawings and a Manufacturing Data Record are supplied against the bid’s submittal list. Where federal funds are involved, sourcing rules are confirmed with the funding agency before we quote.
What you can build
Made in our Vietnam plant
Products · Steel buildings
Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.
Photo
Photo
Long-span rigid frame or truss roof
Starts from: Sports Facilities & Indoor Arenas
Photo
Canopy structure
Scoped to your drawings
Photo
Building packages
Planned steel building packages for the building types US owners ask for most.
See packages →
Photo
Building Package Builder
Pick a use and rough dimensions to draft a scope you can send with your quote request.
Build a package →Engineering
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Public bids name the code edition, submittals and inspection requirements; the supply scope follows them line by line.
Gyms used as storm shelters may need ICC 500 design and a higher risk category, set by the Engineer of Record.
Stairs, guards and walkways follow IBC and ADA requirements confirmed by the architect.
Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.
Solutions · End to end
One partner carries your education, healthcare & institutional buildings building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Steel building design →Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.
Inside the plant →Watch each of your members move through fabrication and QC release, in real time.
PEB Studio →Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.
Vietnam to USA →Piece marks, erection drawings and packing lists let your erector start straight away.
How we work →PEB Studio
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Demonstration data
The Education, Healthcare & Institutional Buildings ecosystem
Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.
ProductsSteel buildings
View all →ProductsBuilding systems
View all →ProductsComponents
+8 more · View all →How we workSolutions
How we helpServices
Your roleWho we serve
View all →State guides
Projects
Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.
Questions and answers
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
Gymnasiums, classroom wings, maintenance and transportation buildings, covered walkways, field houses and storage, framed to the use and occupancy your architect sets.
Steel arrives packed in erection order, which helps your contractor keep deliveries and laydown inside the windows the district allows. Site phasing remains the contractor’s plan.
Yes. A standard wing can be fabricated again for each campus, with loads re-checked for every site.
Yes. Canopies are designed to stand on their own foundations or connect where your engineer confirms the existing structure can take it.
Where ICC 500 applies, the frame is designed to the criteria and risk category your Engineer of Record sets.
IBC 2024 and ASCE 7-22 loads with AISC 360 by default, or the code and any state school criteria your jurisdiction and Engineer of Record set.
Yes. Exposed members are detailed with the architect for appearance, and the finish is applied in our plant to the coating system specified.
Schools are often a higher risk category. We design the seismic force-resisting system to the category your Engineer of Record assigns and weld it to AWS D1.8 procedures where required.
Yes. We follow the submittal list in the bid documents and supply calculations, shop drawings, mill certificates and inspection records in the format requested.
Yes. World Steel holds IAS AC472 accreditation, the first and only fabricator in Vietnam to do so, audited twice a year since 2019.
Yes. Witness points can be attended in person or remotely, and PEB Studio shows each piece’s status in real time.
Yes. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month, so several campus buildings can be in production at once.
Sourcing rules are confirmed with the funding agency before we quote, because some programs restrict imported steel.
No. World Steel designs, fabricates and supplies. Erection and site work are the scope of the US contractor, our customer.
Your Engineer of Record reviews and approves our calculations and drawings and handles the PE seal; the contractor manages the permit and plan review.
The bid documents, structural drawings or criteria, the site address and the submittal requirements. We list any assumptions in the proposal.
Niche facilities and neighbors
Covered in our state guides
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.