Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

New Jersey · Snow and drift

Structural steel for snow and drift on New Jersey roofs

New Jersey snow is not extreme, but a nor’easter can drop a lot of it in one storm, and wind piles it against parapets, roof steps and rooftop units. On a large warehouse or cold store roof, drift sets the purlin and frame design in many places. Ground snow also rises toward the Highlands in the northwest.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Newark–Elizabeth, a short drive from your New Jersey site.

Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Storms
Nor’easters
Governs
Drift at obstructions
Higher snow
Northwest Highlands
Our part
Drift at every step

Why it matters

The roof is the biggest part of the building

A distribution center roof can cover tens of thousands of square meters, with parapets, roof steps, rooftop units, penthouses and solar arrays. Each one collects drift on its leeward side. Low-slope roofs also take rain-on-snow surcharge, and the drainage design has to keep ponding in check.

We calculate drift at each obstruction from the ASCE 7 snow for the site, size the purlins and frames to match, and design platforms and dunnage for rooftop units and their drift.

What we design and fabricate

Steel for snow and drift

Drift-zone purlins

Purlins sized for drift at each obstruction.

Frames

Rigid frames for snow, drift and roof plant.

Rooftop units

Platforms and dunnage with their own drift.

Solar-ready roofs

Roof framing for the arrays your owner plans.

Who does what

Snow design, split clearly

World Steel supplies

  • Snow and drift calculation for the stated basis
  • Purlin, frame and platform design or detailing
  • Roof framing for solar arrays when specified
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Ground snow and risk category confirmed by the Engineer of Record
  • Roof drainage design
  • Engineer of Record approval and PE seal
  • Permit and inspections
  • Erection and site work

New Jersey

What we do not claim

World Steel does not design roof drainage or solar systems. We frame the roof for the loads your Engineer of Record and the system suppliers give us.

New Jersey ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · New Jersey contractors

New Jersey contractors: let’s win the next project together

If your next bid involves snow and drift on big roofs, World Steel wants to be your long-term, win-win steel partner in New Jersey. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your New Jersey project is cut, welded, inspected and packed.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Q&A

What New Jersey buyers ask

Where does drift matter most?

At parapets, roof steps, rooftop units, penthouses and solar arrays, on the side away from the wind.

Can the roof carry solar later?

Yes, if the array load is in the design basis. Tell us the planned arrays and we frame for them.

Is snow higher in northwest New Jersey?

Yes. Ground snow rises toward the Highlands, so we take it for each address.

Official sources: ASCE Hazard Tool

New Jersey solutions

Every New Jersey guide

Related pages

Code facts on this page summarize New Jersey practice, the New Jersey Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in New Jersey?

Send the drawings or the site address, size and use. We set the New Jersey design basis with your Engineer of Record, design or detail the steel to the Uniform Construction Code and to wind, snow and flood, and quote it made in our plant in Vietnam, packed in erection order for Port Newark and a short drive to your site.