Data center steel · Multi-story

Multi-story data centers on heavy steel floors

Where land and power are scarce, data centers stack: halls over halls, electrical rooms under them, offices and network rooms at the end. The floors carry far more than an office floor, and they have to stay stiff. We frame them in steel with composite floors and deliver the columns, beams, deck and stairs as one coordinated package.

Why steel stacks well

Steel frames for heavy, stacked floors

A multi-story data center floor carries racks, power distribution, cooling and often a raised floor or overhead services, all at higher intensity than an office. Composite steel beams acting with a concrete slab on metal deck carry those loads with less depth than most alternatives, and the open beam grid leaves room for services between floors.

Steel frames also go up floor by floor while the deck is placed behind them, so the building can be enclosed early. We design the frame to AISC 360, and to AISC 341 where the seismic design category requires it, for your Engineer of Record to review and approve.

Floor by floor

What each level usually asks of the frame

LevelWhat it holdsWhat drives the steel
Data hall floorsRacks, containment, overhead or under-floor servicesFloor load, vibration and deflection limits in the owner’s criteria
Electrical levelsSwitchgear, UPS and battery roomsConcentrated equipment loads and openings for cable risers
Mechanical galleriesAir handlers and pipe headersHeavy equipment, duct openings and supports for piping
RoofCooling plant, screens and walkwaysDunnage, wind and snow drift on equipment
Office and network endPeople, meet-me rooms, lobbiesStandard office loads and stair and lift shafts

What comes in the package

One coordinated multi-story steel package

Columns and beams

Built-up or hot-rolled columns and composite floor beams with shear studs detailed in the shop drawings.

Metal deck

Floor deck made in Vietnam, laid out per level and packed with the floor it belongs to.

Stairs and shafts

Stair towers, landings and shaft framing detailed with the frame.

Fire protection support

Primer and coating systems compatible with the fireproofing your design specifies.

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Multi-story frame design to US codes for your EOR’s review
  • Composite beams, deck and stairs in one model
  • Floor-by-floor packing in erection sequence
  • IAS AC472-accredited fabrication

The US contractor, our customer, and others

  • Concrete slabs, toppings and raised floors
  • Fireproofing application
  • Erection, field bolting and welding
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a data center.

Looking up at steel floor beams carrying metal deck Photo
Floor beams and metal deck on a World Steel job in southern Vietnam.
Columns and floor beams of a multi-story steel frame partway through erection Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Multi-story data centers: questions we hear

Do you supply the metal deck?

Yes. Floor deck is made in Vietnam and ships with the steel, laid out by level.

Can you meet a vibration criterion for the floors?

Yes, when the owner sets one. The criterion goes into the design basis and the floor framing is sized and checked for it; see the tolerance and vibration guide.

Do you apply fireproofing?

No. We supply steel primed or coated to be compatible with the fireproofing your design specifies. Application is done on site by others.

Does World Steel provide shop drawings for data center steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and the owner’s design criteria govern, and your Engineer of Record confirms them for each project.

Talk to our data center steel team

Send the campus plan, the owner’s design criteria and the phase you are pricing. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.