North Dakota · Data centers
Structural steel for North Dakota data centers
North Dakota’s cold air, available power and open land have drawn data center and high-density computing campuses to the eastern and central parts of the state. Each hall repeats frames, mezzanines and roof plant steel, in blizzard country. We fabricate them as phased releases.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail for your North Dakota site.
- Draw
- Cold air and power
- Pattern
- Repeat halls
- Loads
- Drift and wind
- Release
- Hall by hall
Why it matters
Free cooling, hard winters
Cold air helps cool the halls, but the same winters bring drift around rooftop units and screens and frost-depth foundations. The schedule depends on releasing the next hall while the last is erected.
We keep repeat drawings, check drift at units and screens, pack each hall in erection order and track every member in PEB Studio.
What we design and fabricate
Steel for data halls
Hall frames
Long-span frames that repeat from hall to hall.
Mezzanines and decks
Electrical rooms and galleries on composite or steel deck.
Roof plant steel
Platforms and screens for cooling units.
Cable and duct supports
Tray, duct and equipment support steel by system.
Who does what
Data campus steel, split clearly
World Steel supplies
- Hall frames, mezzanines and roof plant steel
- Repeat drawings and phased releases
- Steel packed in erection order by hall
- Live production tracking in PEB Studio
- Tekla shop and erection drawings, included
The US contractor arranges
- Campus design with the owner’s Engineer of Record
- Engineer of Record approval and PE seal
- Foundations, slabs and utilities
- Mechanical, electrical and controls
- Erection and site work
North Dakota
What we do not claim
World Steel names no North Dakota data center owner as a customer and claims no completed North Dakota project. Photos show World Steel projects abroad and our plant in Vietnam.
North Dakota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · North Dakota contractors
North Dakota contractors: let’s win the next project together
If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in North Dakota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your North Dakota project is cut, welded, inspected and packed.
Q&A
What North Dakota buyers ask
Can you repeat a hall design?
Yes. We keep repeat drawings and release hall by hall.
Do you check drift around rooftop units?
Yes. Drift at units and screens is checked on every roof.
Do you name data center owners?
No. World Steel names no company as a customer on this site.
Official sources: North Dakota Department of Commerce
North Dakota solutions
Every North Dakota guide
Related pages
Code facts on this page summarize North Dakota practice, the North Dakota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in North Dakota?
Send the drawings or the site address, size and use. We set the North Dakota design basis with your Engineer of Record, design or detail the steel to the North Dakota State Building Code, blizzard drift and deep cold, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail for the truck to your site.