2,500 t
structural steel fabricated a month (about 2,750 short tons)
Since 2019
IAS AC472 accredited, the first and only fabricator in Vietnam
Twice a year
plant and design office audited under the IAS program
300+
people in engineering, production and quality control
Getting here
From the runway to the shop floor in about 80 minutes
Three stops, two short drives. You meet the people who design your steel, then the people who build it, on the same day.
-
Tan Son Nhat International Airport (SGN)
Ho Chi Minh City’s international airport. Land, clear immigration and meet our team.
- 20 min
-
Photo
World Steel head office
55 Le Thuc Hoach Street, Ho Chi Minh City. The engineers who design your steel work here: design review, Tekla model, PEB Studio.
- 60 min
-
Photo
World Steel plant, Hai Son Industrial Park
Duc Hoa, Tay Ninh Province. 20,000 m² (215,000 sq ft) of fabrication halls where your steel is cut, welded, coated, inspected and packed.
Your visit day
One day, office to shop floor
Morning at the head office
Meet the engineers and project managers. Walk through the design basis, the Tekla model and how your project would run in PEB Studio.
Drive to the plant
About an hour west of the city by car to Hai Son Industrial Park. A good time to go over the audit plan.
Walk the shop floor
Material intake, CNC cutting, beam lines, fit-up and welding, blasting, the paint hall, QC release and packing, in the order steel moves.
Audit the records
Sit down with QC: mill certificates, welding procedures and welder qualifications, inspection reports and the IAS AC472 program.
Close-out
Questions answered on the spot, open items written down, and the follow-up sent by email after your visit.
Factory audit
Build your audit checklist
Tap what your team wants to audit. Your picks go straight into the booking form, and we prepare those records and stations for the day.
0 of 8 on your list
You will not be the first auditor
Audited twice a year since 2019
Under IAS AC472 the plant and the design office are audited twice a year, with IAS experts and Smith-Emery, the inspection agency named on our certificate. The records your auditors ask for are the ones those audits check.




Who visits
Teams that qualify their fabricator in person
General contractors
Project and preconstruction managers qualifying the fabricator for a large US job.
Owners and developers
Owner’s representatives who want to see the plant behind the bid.
Engineers of Record
Design teams checking how their drawings become fabricated steel.
Special inspectors and QA agencies
Third-party agencies witnessing hold points or auditing the shop.
Plan your trip
Good to know before you fly
Pick two or three dates
We check them against the production schedule, so you see the work you came for, and confirm one by email.
Visa for Vietnam
US passport holders need a visa for Vietnam. Most visitors apply for the official e-visa before they fly. Check the current rules for your trip.
Where we meet
At the head office in Ho Chi Minh City, about 20 minutes from Tan Son Nhat Airport, before the drive to the plant.
On the shop floor
Closed-toe shoes please. We brief every visitor on the shop’s safety rules on arrival.
Book a visit
Your visitor pass
Suggest your dates and tell us who is coming. We confirm the day by email and send the agenda before you fly.
Questions
Plant visit questions
How far is the plant from the airport?
Tan Son Nhat International Airport (SGN) to the World Steel head office in Ho Chi Minh City takes about 20 minutes by car. From the head office to the plant at Hai Son Industrial Park, Tay Ninh Province, it is about 60 minutes. Traffic in the city can change both.
Can we audit the plant as part of supplier qualification?
Yes. Tell us which records and processes your checklist covers, and we prepare them for the day: mill certificates, welding procedures and welder qualifications, inspection and coating reports and the IAS AC472 quality program.
Can our special inspector come too?
Yes. Your special inspector or a third-party agency can witness hold points on your order at the plant. The plant is also inspected under IAS AC472 by Smith-Emery, the agency named on our certificate.
Is the visit tied to an order?
No. Many contractors visit before they bid or sign. If you have a job in mind, tell us its size and type so we can show similar work on the floor.
What if we cannot travel?
Book an online audit instead. We walk the shop floor on camera over Zoom or Microsoft Teams, share the records on screen and send the recording afterward.
Is any steel fabricated in the United States?
No. All structural steel for US orders is fabricated in this plant in Vietnam and shipped to a US port. The Westminster, California office handles quotes and coordination only.