Structural steel for Omaha data center campuses
The Omaha metro, especially Sarpy County and Papillion, hosts some of the largest data center campuses in the Midwest, with central location, power and fiber. Campuses grow hall by hall with repeat frames, mezzanines and roof plant steel. We fabricate them as phased releases.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail to Omaha for your Nebraska site.
- Hubs
- Sarpy and Douglas counties
- Pattern
- Repeat halls
- Key steel
- Roof plant platforms
- Release
- Hall by hall
Why it matters
Repeat halls on the prairie
Each hall repeats the frames, electrical galleries and roof plant of the last, and the schedule depends on releasing the next hall while the last is erected. Blizzard drift around rooftop units is a design check on every hall.
We keep repeat drawings, pack each hall in erection order and track every member in PEB Studio, so the site sees what ships next.
What we design and fabricate
Steel for data halls
Hall frames
Long-span frames that repeat from hall to hall.
Mezzanines and decks
Electrical rooms and galleries on composite or steel deck.
Roof plant steel
Platforms and screens for cooling units.
Cable and duct supports
Tray, duct and equipment support steel by system.
Who does what
Data campus steel, split clearly
World Steel supplies
- Hall frames, mezzanines and roof plant steel
- Repeat drawings and phased releases
- Steel packed in erection order by hall
- Live production tracking in PEB Studio
- Tekla shop and erection drawings, included
The US contractor arranges
- Campus design with the owner’s Engineer of Record
- Engineer of Record approval and PE seal
- Foundations, slabs and utilities
- Mechanical, electrical and controls
- Erection and site work
Nebraska
What we do not claim
World Steel names no Nebraska data center owner as a customer and claims no completed Nebraska project. Photos show World Steel projects abroad and our plant in Vietnam.
Nebraska ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Nebraska contractors
Nebraska contractors: let’s win the next project together
If your next bid involves Omaha data centers, World Steel wants to be your long-term, win-win steel partner in Nebraska. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Nebraska project is cut, welded, inspected and packed.
Q&A
What Nebraska buyers ask
Can you repeat a hall design?
Yes. We keep repeat drawings and release hall by hall.
Do you check drift around rooftop units?
Yes. Drift at units and screens is checked on every roof.
Do you name data center owners?
No. World Steel names no company as a customer on this site.
Official sources: Greater Omaha Chamber
Nebraska solutions
Every Nebraska guide
Related pages
Code facts on this page summarize Nebraska practice, the Nebraska State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Nebraska?
Send the drawings or the site address, size and use. We set the Nebraska design basis with your Engineer of Record, design or detail the steel to the Nebraska State Building Code and to blizzard snow and plains wind, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail to Omaha for the truck to your site.