Massachusetts · Life sciences
Structural steel for Massachusetts life sciences lab buildings
Greater Boston is one of the world’s largest life sciences clusters. Lab buildings rise in Kendall Square, the Seaport and Allston, and spread to Route 128, Worcester and the I-495 belt for biomanufacturing. They need floors that stay still, tall floor-to-floor heights for ducts and a roof full of mechanical plant.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped through New York–New Jersey or Boston to your Massachusetts site.
- Clusters
- Cambridge, Boston, 128
- Floors
- Stiff, low vibration
- Heights
- Tall floor to floor
- Roof
- Heavy mechanical plant
Why it matters
Still floors and heavy roofs
Lab benches and imaging equipment need floors that do not bounce, so vibration, not strength, often sets the beam sizes. Air changes call for large ducts and tall floor-to-floor heights, and exhaust fans, air handlers and chillers sit on the roof inside screens that catch snow and wind. Urban sites leave little room to lay down steel.
Our plant fabricated multi-story frames such as The Sun Tower in Vietnam and the College of Medicine in the Philippines. We design or detail composite floor framing to the vibration criteria your engineer sets, mechanical platforms and screens, and release the steel floor by floor for tight sites.
What we design and fabricate
Steel for lab buildings
Composite floors
Beams and girders sized for vibration criteria.
Roof plant
Platforms and screens for fans and air handlers.
Frames
Braced or moment frames for tall floor heights.
Fire protection
Steel prepared for the specified fireproofing.
Who does what
Lab building steel, split clearly
World Steel supplies
- Floor framing, frame and platform design or detailing
- Vibration-checked beam and girder sizes to the stated criteria
- Primed steel ready for fireproofing
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Vibration criteria and lab planning with the owner
- Engineer of Record approval and PE seal
- Fireproofing and special inspections
- Permit and construction control
- Erection and site work
Massachusetts
What we do not claim
World Steel names no life sciences company in Massachusetts as a customer. The Sun Tower and the College of Medicine are projects in Vietnam and the Philippines.
Massachusetts ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Massachusetts contractors
Massachusetts contractors: let’s win the next project together
If your next bid involves life sciences labs, World Steel wants to be your long-term, win-win steel partner in Massachusetts. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Massachusetts project is cut, welded, inspected and packed.
Q&A
What Massachusetts buyers ask
Can you design floors for lab vibration?
Yes. We size beams and girders to the vibration criteria your Engineer of Record sets and report the checks.
Do you supply roof screens and platforms?
Yes. Mechanical platforms, screens and dunnage are designed with the snow and wind on the roof.
Can you supply steel floor by floor?
Yes. We release and pack the steel by floor and area so it arrives in the order a tight urban site can take it.
Official sources: Massachusetts Life Sciences Center
Massachusetts solutions
Every Massachusetts guide
Related pages
Code facts on this page summarize Massachusetts practice, 780 CMR, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Massachusetts?
Send the drawings or the site address, size and use. We set the Massachusetts design basis with your Engineer of Record, design or detail the steel to the 780 CMR and to snow, drift and coastal wind, and quote it made in our plant in Vietnam, packed in erection order for the port and the truck to your site.