Caribbean guide · Hurricane wind

Hurricane wind design for Caribbean steel structures

A Caribbean hurricane does not push on a building, it pulls it apart: suction on the roof, pressure on the windward wall, a burst door that pressurizes the inside. We take the wind speed and exposure your engineer of record sets, turn them into pressures on every part of the steel and check the load path from the roof sheet to the anchor bolt.

V²pressure climbs with the square of speed
Exposure Dopen sea upwind
6 linksin the load path we check
Your EORsets the site values

Velocity pressure

Wind speed in, pressure out

Velocity pressure grows with the square of the wind speed. Ten percent more wind gives about twenty-one percent more pressure on the steel. The values below are the basic pressure at 1.0 exposure on flat ground, before the code's pressure coefficients, so you can see how fast the load climbs.

q = 0.613 · Kz · Kzt · Kd · Ke · V²

SI form of the ASCE 7 velocity pressure, in pascals with V in m/s. Kd 0.85 for building frames. Your engineer of record sets V for the island and risk category.

60 m/s134 mph 1.88 kPa (39 psf)
65 m/s145 mph 2.20 kPa (46 psf)
70 m/s157 mph 2.55 kPa (53 psf)
75 m/s168 mph 2.93 kPa (61 psf)
80 m/s179 mph 3.34 kPa (70 psf)
85 m/s190 mph 3.76 kPa (79 psf)

What changes the load

Four factors that move the pressure on your site

Exposure

Open sea upwind is Exposure D, the harshest. At 9.1 m (30 ft) the factor is about 1.16 against 0.98 for open country and 0.70 for a built-up town.

B · town 0.70C · open 0.98D · shore 1.16

Topography

Wind speeds up over ridges, hills and escarpments. Hillside villas and hilltop towers on volcanic islands often carry a topographic factor well above 1.0.

Flat 1.0Hill crest above 1.0

Risk category

Shelters, hospitals and emergency buildings are designed for a longer return period, so the design wind speed rises with the importance of the building.

Warehouse IISchool IIIShelter IV

Enclosure

A building that may lose a door or window in the storm is designed as partially enclosed, with a much larger internal pressure acting with the roof suction.

Enclosed lowPartially enclosed high

Codes

The wind codes behind Caribbean permits

Each island decides its own code. Most trace back to the Caribbean Uniform Building Code or to the International Building Code, which takes its wind loads from ASCE 7. We design to the edition the authority and your engineer of record name.

Code familyWhere you meet itWind loads from
CUBiC, Caribbean Uniform Building Code (1985)The regional model code that shaped many national codes in the Eastern CaribbeanIts own wind section, now often replaced by later editions
OECS Building CodeMember states of the Organisation of Eastern Caribbean StatesIBC basis with regional provisions
National building codesJamaica, Barbados, The Bahamas, Trinidad and Tobago and othersNational wind provisions, often IBC and ASCE 7 based
Puerto Rico Building CodePuerto RicoIBC with ASCE 7 wind maps that cover the island
International Building CodeUS Virgin Islands, Cayman, Bermuda and many private and resort specificationsASCE 7
Dutch Caribbean and Dominican Republic regulationsAruba, Curaçao, Sint Maarten and the Dominican RepublicNational regulations named by the authority

Each island's code and approvals are on its own page, from Jamaica to Puerto Rico and Barbados. US loads: ASCE 7 explained.

Load path

Six links from the roof sheet to the ground

A hurricane finds the weakest link. We check every one of them for uplift and for the sideways push, in both wind directions, and list the result in the design report your engineer of record reviews.

Roof uplift in detail
  1. Roof sheet and fasteners

    Suction peaks at corners and edges; the sheet, its screws and their washers come first.

  2. Purlins and girts

    Spans and spacing tighten in the edge zones; uplift puts the inner flange in compression, so flange braces matter.

  3. Purlin cleats and bolts

    Reversing loads every few seconds in a storm, so cleats are bolted, never just tacked.

  4. Rafters and columns

    Frames carry the uplift and the sideways push together; we check both directions.

  5. Bracing and portal frames

    Rods, angles or portal frames take the wind along the building to the foundations.

  6. Base plates and anchor bolts

    Uplift and shear at every column; bolt size, edge distance and embedment go to your foundation engineer.

From our plant

Frames, end plates and base plates for the wind

Real World Steel photos from our plant in Vietnam and from buildings we supplied. None is shown as a Caribbean site.

Long factory building framed with red tapered portal frames and roof purlins
Rows of columns, rafters and purlins inside a large steel building
Welded members with drilled end plates laid out side by side
Tubular column with a square base plate and bolt holes, crew working behind it

Caribbean hurricane and marine guides

The rest of the storm and salt-air story

The code, port and parishes of each island are on its own page:

Questions

Questions on hurricane wind design

What wind speed do you design Caribbean buildings for?

The one the code and your engineer of record set for the island, the risk category and the site. Puerto Rico and the US Virgin Islands are mapped in ASCE 7; other islands set the value in their national code. We state the speed, exposure and factors in the calculations.

Why does a small increase in wind speed matter so much?

Pressure grows with the square of the speed. Going from 60 to 70 m/s (134 to 157 mph) raises the basic pressure from about 1.88 to 2.55 kPa (39 to 53 psf), a rise of more than a third.

Is a beachfront site really worse than a site in town?

Yes. Open water upwind is Exposure D, the harshest category. At 9.1 m (30 ft) its exposure factor is about 1.16 against 0.70 in a built-up town, so the same wind puts roughly two thirds more pressure on the beachfront building.

Do you design for doors failing in the storm?

When the building may lose a door or window, it is designed as partially enclosed, with a higher internal pressure. The other route is doors and glazing rated for the design wind and debris, which your team buys locally.

Can you rate a building for a Category 5 hurricane?

No. Hurricane categories describe storms. We design to the wind speed the code sets for the site, which is how authorities and insurers judge a structure.

Do you check the foundations?

We give the column reactions, uplift and shear at every base and design the base plates and anchor bolts. The foundations are designed by your engineer.

Building on a hurricane island?

Send the drawings or the island, site and use. We set the wind basis with your engineer of record, design the steel load path end to end and quote it made in our plant in Vietnam and shipped to your port.