Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

For metal building dealers and distributors

Engineered steel buildings you can sell under your own customer relationships

Your customers ask for sizes and spans that no fixed catalog covers. World Steel engineers each building to the customer’s site and drawings, fabricates it in its own plant in Vietnam and supplies it OEM or under your label, with 100% of materials from Vietnam plants.

  • Engineered sizes beyond a fixed catalog
  • Drawings and calculations your customers can submit
  • A supply relationship built for repeat orders

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

Large-project capacity

2,500 t of structural steel a month

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.

How large jobs run

Your role, your problems

The problems we hear most, and our answer to each

  • Sizes outside the catalog

    Customers want widths, heights and spans the standard sheet does not list.

  • Drawings for every permit

    Each sale needs calculations and drawings for the building department.

  • Supply that runs out

    Small fabricators cannot keep up when your sales grow.

  • Engineered to each siteEvery building designed to its own wind, snow and seismic loads.
  • Drawings you pass onCalculations and drawings ready for your customer’s Engineer of Record.
  • OEM or private labelYour brand on the building, our plant behind it.
  • Capacity that scales2,500 t a month, so a growing order book does not stall.

Dealer program

What a dealer program looks like

Arrangements are agreed case by case, with no exclusivity implied.

What a dealer program looks like

  • Private label

    Your brand on drawings and packaging; World Steel stays in the background.

  • Engineering desk

    A named engineer turns your customer’s brief into a priced design.

  • PEB Studio access

    Follow every order from cutting to shipping and share progress with customers.

  • Consolidated shipping

    Several customer orders packed and shipped together where the program allows.

100% of materials from Vietnam plants, fabricated in World Steel’s own plant. No exceptions.

Request a quotation

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Become a dealer or supply partner
Become our partner in the USDealers and distributors join through the partnership program, with private RFQs, private label options and terms agreed case by case. Partner program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that metal building dealers & distributors use most, each with its own page to read before you call.

Ecosystem for Metal Building Dealers & Distributors

  • Packing & shippingBundled in erection sequence, documented for US customs and shipped to West, Gulf or East Coast ports.
  • Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What metal building dealers & distributors ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Become a dealer or supply partner
Can World Steel supply under our brand?

Yes. OEM and private label supply is available. Materials are 100% from Vietnam plants, and the building is fabricated in World Steel’s own plant.

Are buildings engineered per site?

Yes. Each building is designed to its own site loads and the code edition adopted where it is built.

Do you provide drawings for permits?

Yes. Calculations and drawings are prepared for the review and approval of your customer’s Engineer of Record, who seals them where required.

Is there exclusivity by territory?

No exclusivity is implied. Arrangements are agreed case by case in writing.

What volume can you support?

The plant fabricates about 2,500 metric tons a month and runs several orders in parallel.

Who erects the buildings?

Your customer’s contractor. World Steel designs, fabricates and supplies the steel.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.