Ohio · Data centers

Structural steel for Ohio data center campuses

New Albany, Hilliard, Dublin and the rest of the Columbus region have become one of the fastest-growing data center markets in the US, with campuses spreading into the counties around them. Each campus builds several data halls in phases, with heavy cooling plant on the roof or in yards, and Ohio snow piles against every screen and step on those roofs.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Ohio site through the East Coast ports.

Light gray warehouse roof beside process plants, seen from above
Drone view of a World Steel warehouse on an overseas industrial site.
Market
Columbus region and central Ohio
Steel
Data halls, roof plant, yards
Loads
Equipment plus snow drift at screens
Our part
Repeatable halls, released by phase

Why it matters

Repeatable halls, heavy roofs and drifting snow

A data hall is a long-span steel building repeated across a campus. The steel carries heavy cooling units, cable trays and piping, and its deflection limits are tighter than a warehouse. In Ohio, screens around rooftop plant collect snow drifts that add to those equipment loads.

We design the frames, roof framing and equipment supports together for the loads at your site, and keep the details repeatable so the second and third halls go up faster than the first.

What we design and fabricate

Steel for an Ohio data center campus

Data hall frames

Long-span frames with tight deflection limits.

Roof equipment framing

Dunnage and screens with snow drift included.

Generator and switchgear yards

Platforms, stairs and screens in the yard.

Cable and pipe supports

Steel for trays, piping and corridors.

Phases

How a campus is released

PhaseSteel releasedWhat we keep the same
First hallFrames, roof framing, yard steelGrid, connections, piece marks
Next hallsRepeat frames, adjusted equipment framingDetails and drawing set
Support buildingsOffices, warehouses, substationsCoating system and standards

What we do not claim

World Steel names no data center operator as a customer. We fabricate the structural steel to the drawings your Engineer of Record approves.

Ohio ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Ohio contractors

Ohio contractors: let’s win the next project together

If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Ohio. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Ohio project is cut, welded, inspected and packed.

Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.
Metal floor deck laid on each level of a steel-framed building
Going up beside the plant in Vietnam: World Steel framed its own office building.

Q&A

What Ohio buyers ask

Can you supply repeat halls on a campus?

Yes. We keep the grid, connections and piece marks consistent so each new hall repeats the last.

Do you include snow drift on equipment screens?

Yes. Drifts at screens and steps are part of the roof design for Ohio sites.

Do you supply the data center shell?

Yes, as a complete building package or as structural steel to your drawings.

Official sources: JobsOhio: technology

Ohio solutions

Every Ohio guide

Related pages

Code facts on this page summarize Ohio practice, the Ohio Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building department confirm the edition and amendments in force for your plan approval.

Building in Ohio?

Send the drawings or the site address, size and use. We set the Ohio design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.