Texas · Hail, tornado and high wind
Steel roofs and frames for Texas hail and storm country
North Texas, the Panhandle and the High Plains see more large hail than almost anywhere in the country, plus severe thunderstorm winds and tornadoes every spring. Owners and insurers ask about the roof first. We design the steel for ASCE 7-22 wind and talk through panel choices before we quote them.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Texas port.
- Wind design
- ASCE 7-22 for the site; tornado loads where the code or owner requires
- Hail
- Panel, gauge and profile chosen with the owner and insurer
- Storm shelters
- Designed to ICC 500 by the shelter designer
- Our part
- Frames, secondary steel and roof systems to the agreed basis
Why it matters
Big roofs, big storms
A distribution building in Dallas–Fort Worth can carry 50,000 m² (540,000 sq ft) of roof. Hail decides how that roof ages, and severe thunderstorm downbursts can load it as hard as a hurricane does on the coast. The steel frame, the purlins and the roof panel attachment all have to be designed for the wind of the site.
ASCE 7-22 added tornado loads for buildings in Risk Categories III and IV in the tornado-prone parts of the country, which includes much of Texas. Your Engineer of Record decides whether they apply; when they do, we include them in the design basis on the first sheet of the calculations.
Choices we discuss
What changes for a Texas storm roof
Panel and gauge
Thicker panels and stiffer profiles resist denting better; we state which option the quote includes.
Impact ratings
Where an insurer asks for a tested impact rating, we name the product that carries it, or say plainly that it does not.
Uplift and attachment
Clips, fasteners and purlin spacing set for the edge and corner zones of the roof.
Frames and bracing
Rigid frames and bracing sized for wind on every face of the building.
Skylights
Skylight panels and their framing chosen with hail in mind, or left out where the owner prefers.
Storm shelters
Shelters to ICC 500 are designed by the shelter designer; we can fabricate the steel to that design.
What we do not claim
We claim no hail, impact or tornado rating for any product we make. Where a tested rating is required, the product that carries it is named in the quote, and no building is storm-proof.
Texas ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Texas project is cut, welded, inspected and packed.
Q&A
What Texas buyers ask
Are your roof panels hail-rated?
We do not claim an impact rating for our panels. Where your insurer requires a tested rating, we discuss the options and name a product that carries it, or confirm that the quoted panel does not.
Do you design tornado shelters?
No. Storm shelters are designed to ICC 500 by a specialist designer. If you need the steel for a shelter, we fabricate it to that design.
Does tornado design apply to my warehouse?
Usually not for a Risk Category II warehouse. ASCE 7-22 tornado loads apply to Risk Category III and IV buildings in tornado-prone regions; your Engineer of Record confirms.
Texas solutions
Every Texas guide
Related pages
Code facts on this page summarize Texas rules, the International Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Texas?
Send the drawings or the site address, size and use. We set the Texas design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.