Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Six-story steel frame seen from the front, floor deck in place

Building package · Multi-story steel

Multi-story steel buildings, designed for US codes and made in our own plant

Offices, medical office, classrooms, lodging and mixed use, from two stories to mid-rise. World Steel designs the frame, details every connection, fabricates it in our plant in Vietnam and ships it to your US port in erection order, while you follow each member live in PEB Studio.

Every member is made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, from steel ordered to US grades. Westminster, California is our US office, not a plant.

A four-story steel frame Columns spliced between levels, composite floor beams on metal deck, a braced bay for sideways load, a stair tower and the base plates on anchor rods. Roof beams Composite floorbeams on metal deck Braced baycarries wind andearthquake load Column splice Base plateson anchor rods Stairs MADE IN OUR PLANT IN VIETNAM · SUPPLIED TO US CONTRACTORS
Design basis
IBC 2024 · ASCE 7-22 · AISC 360, AISC 341 where required
Approval
Drawings for your Engineer of Record
Plant
First and only IAS AC472 fabricator in Vietnam
Shop drawings
Included at no extra charge
Scope
Steel structure only, supplied to US contractors

Proof of capacity

Multi-story buildings we have already framed

11
multi-storey steel frames on record
1,500 t
of steel in one phase of one tower job (Tongwei Tien Giang)
2,500 t
of structural steel a month from our own plant in Vietnam
2 plants
for one repeat customer, Haid Group
See all 11 multi-storey projects

What is in a World Steel multi-story frame

Every piece of the frame, from base plate to roof beam

One supplier, one Tekla model and one set of shop drawings for the whole steel structure. Each part opens its product page.

  • Columns Rolled wide-flange or built-up columns, spliced at planned levels, with base plates and anchor rod layouts.
  • Floor beams and girders Composite beams for concrete on metal deck, with camber and shear stud layouts on the shop drawings.
  • Lateral system Braced frames or moment frames that carry wind and earthquake loads to the foundations.
  • Metal floor deck Composite or form deck for each level, supplied as an option.
  • Stairs and cores Steel stair towers, landings, handrails and framing around elevator shafts.
  • Connections Shop-welded plates, cleats and end plates, bolted on site with high-strength structural bolts.
  • Roof and screen framing Roof beams, mechanical screens and support steel for rooftop equipment.
  • Fire protection coordination Primer compatible with the specified fireproofing, with listed assemblies coordinated with your architect.

How the building stands up to wind and earthquakes

Braced, moment or both: the lateral system decides the layout

Your architect’s floor plan and the site’s wind and seismic loads point to the system. We compare the options with your team before any steel is sized.

Braced frames

How it works
Diagonal braces in chosen bays carry sideways load as tension and compression, so the frame stays stiff with light members.
Best for
Offices, schools and lodging where a few bays can take braces, often around stairs and cores.
What we fabricate
Braces, gusset plates and the beams and columns of the braced bays, with gussets detailed for the brace to yield where the seismic design asks for it.

Moment frames

How it works
Rigid beam-to-column connections resist sideways load by bending, leaving every bay open.
Best for
Ground-floor retail, showrooms, lobbies and facades with large openings.
What we fabricate
Deep beams and columns with stiffeners, continuity plates and end-plate or welded connections, prequalified to AISC 358 where the seismic system requires it.

Combined systems

How it works
Braced frames in one direction and moment frames in the other, or braced cores with gravity framing around them.
Best for
Buildings that need open frontage on one side and economy everywhere else.
What we fabricate
Both families of members in one Tekla model, so connections, splices and erection order stay consistent.

Floors people work on every day

Floors that feel solid, with room for every service

Floors are where a multi-story building earns or loses its occupants. These are the checks we make on every level.

Bay layout

Bay sizes are compared against your floor plan and the governing load case, because the right grid saves more steel than any other choice.

Vibration and deflection

Beam depth and spacing checked for footfall vibration and deflection, with criteria your Engineer of Record agrees for the use of each floor.

Composite action

Beams designed to act with the concrete slab through shear studs, so they can be shallower and lighter.

Openings for services

Web openings for ducts and pipes located from the coordinated model, reinforced where needed and cut in the plant.

Fire resistance

Ratings from the IBC construction type; primer chosen to suit the fireproofing system your architect specifies.

Repeated connections

A small set of repeated bolted details floor after floor, so your erector bolts up quickly and safely at height.

A complete design and fabrication solution

One partner from the first sketch to the last container

Design, drawings, fabrication, quality records and shipping come from one team in one plant, and you watch every step happen. Your US contractor erects it on site.

  1. Project assessment

    We review your plans, site and program, then confirm code basis, loads and the lateral system with your team.

    Design optimization
  2. Design for your approval

    Analysis in SAP2000, member and connection design to AISC 360, with calculations and drawings for your engineer to review and approve.

    Steel building design
  3. Approval and shop drawings

    Approval drawings and design report, then shop drawings and a Tekla model, included at no extra charge.

    Shop drawings
  4. Fabrication in Vietnam

    Cutting, welding, blasting and coating in our IAS AC472 accredited plant, with US-grade steel and 3.1 mill certificates.

    Inside our factory
  5. Live tracking and QC

    Every member followed in PEB Studio; your inspector witnesses hold points in person or over live video.

    PEB Studio
  6. Packed by level

    Bundled and tagged in erection order, level by level, with packing lists and photos for every load.

    Packing and shipping
  7. Shipped to your port

    Incoterm, port of discharge and importer of record named in the quote; inland delivery coordinated.

    Vietnam to USA logistics
  8. Erected by the US contractor

    Erection is the scope of the US contractor, our customer and partner, working from our erection drawings with our engineers on call.

    Contractor partnership

Drawings at every stage

From proposal drawings to the approved shop drawing

You review and approve at each stage, so nothing is cut until the drawings match your building. Shop drawings come at no extra charge.

  1. With the quotation

    Proposal drawings

    For projects World Steel designs: general arrangement, frame lines, elevations and the scope of supply the quotation covers, so you see exactly what the price includes.

    Reviewed by: You, your architect and your estimator

    See a sample set →
  2. After the contract is signed

    Approval drawings (APD) and Design Report

    Anchor rod plan with column reactions, framing plans, elevations and sections, plus the Design Report with the structural calculations. Your Engineer of Record reviews, approves and seals them for the permit.

    Reviewed by: Your Engineer of Record, architect and building department

    Learn more →
  3. After the APD is approved

    Shop drawings and Tekla model

    Assembly and single-part drawings, CNC files, roof and wall sheeting, erection drawings, bolt lists and the IFC model, all from one Tekla model. Included on every project at no extra charge.

    Reviewed by: Your reviewer, then our plant

    Learn more →
  4. Once sheets are released

    Fabrication to the approved revision

    Members are cut, welded, coated and inspected in our Vietnam plant against the approved revision, and PEB Studio records which revision every piece was made to.

    Reviewed by: You, live in PEB Studio

    Learn more →

What we need from you

To optimize your design, send us

  • Architectural drawingsPlans, elevations and sections with clear heights, openings and finishes.
  • Structural drawings, if you have themYour engineer’s design and calculations, or the structural concept, so we optimize from a known starting point.
  • Your preferred schemeFrame type, spans, bay spacing, cranes, mezzanines, any future expansion and anything you want kept as drawn.
  • Site address and code editionThe location sets wind, snow and seismic loads; we confirm the code edition your jurisdiction enforces.
  • Geotechnical reportSoil data lets us choose base fixity and report reactions your foundation engineer can use.
  • Your site dateThe day your site needs steel, so production and shipping are planned backward from it.

Design optimization

Less steel, lower cost, every member fits the container

Before a single plate is cut, our engineers optimize your building for the loads at your site, for our plant and for the trip across the Pacific. The result is a frame that carries the same code loads with less steel, ships in standard containers and goes into production quickly, from materials already available in Vietnam.

  • Optimized steel tonnage

    Tapered built-up frames follow the bending moment, and bay spacing, purlins and girts are tuned as one system. Your building carries the same code loads with the steel it actually needs, and the proposal reports the tonnage for your project.

    Tapered frames Built-up steel sections Z purlins

  • Lower investment cost

    Less steel to buy, fewer shop hours, fewer containers and simpler bolted erection all lower the installed cost of the building. The proposal shows the effect of each option on your project, never a generic percentage.

    Complete building package Building packages Components-only supply

  • In-depth project assessment

    Engineers review your drawings, the code edition your jurisdiction enforces, wind, snow and seismic data, foundations, erection sequence and the route to your site, then write down the risks and options they find before you commit.

    Steel building design Design process US codes & standards

  • Designed to ship in containers

    Every member is detailed to fit inside a standard 20 ft or 40 ft shipping container, with splices placed by the engineer, not cut on the shop floor. Containers are the most economical way to move steel from Vietnam to the US, and they reach your port sealed.

    Shipping Vietnam to USA Export packing & shipping Incoterms for steel buildings

  • Fast response to your production schedule

    Design, detailing and fabrication sit under one roof, and the materials are already available in Vietnam, so approved drawings move into production without waiting on imported steel. Your production slot is booked against your site date and tracked live in PEB Studio.

    Shop drawings, included PEB Studio Project management

  • Quality materials from Vietnam plants

    Most of the plate, coil and sections come from steel plants in Vietnam, ready for our plant without long import queues. Each heat arrives with the mill’s EN 10204 type 3.1 inspection certificate, and its heat number follows every member it goes into.

    World Steel factory Quality control IAS AC472 accreditation

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

The worry: “Will steel designed overseas pass US plan check?”

Designed to US codes, ready for your engineer’s review

We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.

The worry: “I can’t see the quality from across the Pacific.”

An accredited plant you can inspect, live

Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.

The worry: “Will the materials be traceable to the grade on the drawings?”

Mill certificates by heat number

Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.

The worry: “What if pieces don’t fit when they reach the site?”

Modeled, approved, then measured

Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.

The worry: “How will I know where my order really is?”

Real-time tracking in PEB Studio

You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.

The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”

Packed in erection order, listed per container

Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.

The worry: “Who handles customs and duties?”

Incoterm and importer of record in writing

Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.

The worry: “Time zones and language will slow everything down.”

One English-speaking project manager

Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.

The worry: “Who erects it, and who stands behind the field work?”

Your US contractor erects, with our drawings

World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.

The worry: “Who is responsible for the design?”

Scope split agreed before you sign

We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.

  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

Multi-story projects World Steel has built

Floors over floors, already standing

Real World Steel projects with our steel structure: city towers, a healthcare office, a car park and a US-code building in the US territory of Guam. Each card opens the project; the bare frames of our other multi-story work follow below.

Exterior design render of the two-storey FPI Barracks on Guam, gable end and long side 3D model
Designed under US codes

FPI Barracks, the US territory of Guam

Designed by World Steel under US codes in the US territory of Guam: seismic design, a structural calculation report and permit drawings, then shop drawings, fabrication in Vietnam and shipment. About 120 metric tons (132 short tons) of steel for a two-story frame with steel floor deck, supplied with roof and wall panels.

Open the project

Projects outside the US are shown for the structure type; they are not US sites and do not describe the code criteria of a US project.

All World Steel projects

Real multi-story frames

Steel skeletons, floor over floor, from our plant

Process towers, offices, a showroom and a college: multi-story frames World Steel designed and fabricated, shown bare before the cladding went on. One plant, 2,500 t of structural steel a month. Tap a photo to enlarge it, or open the project.

Bare multi-storey steel frame of the Tongwei Tien Giang feed mill process tower: grey columns, floor beams at every level and stairs up one side Photo
Tongwei Tien Giang feed factory, phase 1 Feed mill process tower · Dong Thap Province, Vietnam · 2018 · 1,500 t
Two views of the braced multi-storey steel frame of the Tongwei Hai Duong process tower, X-bracing on its faces, before cladding Photo
Tongwei Hai Duong feed factory Feed mill process tower · Hai Phong City, Vietnam · 2020
Red-primed multi-storey steel tower frame of the Haid Vinh Long feed factory with diagonal bracing on every face Photo
Haid Vinh Long feed factory Feed mill process tower · Vinh Long Province, Vietnam · 2024
Stepped red multi-storey steel frame of the Thang Long aquatic feed factory with two mobile cranes lifting members Photo
Thang Long (Haid Group) aquatic feed factory Feed mill process tower · Hai Phong City, Vietnam · 2024
Welded box columns and plate girders for the New Hope Dong Nai feed factory on the shop floor of World Steel’s plant in Vietnam Photo
New Hope Dong Nai feed factory Box columns for a feed factory · Chon Thanh, Vietnam · 2026
Red-primed multi-storey steel frame of the World Steel office in Tay Ninh with floor beams, metal deck and steel stairs Photo
World Steel office, Tay Ninh Office building · Tay Ninh Province, Vietnam · 2023
Yellow-primed multi-storey steel frame of the World Steel office on a narrow city lot in Ho Chi Minh City, deck on the floors and an outside stair Photo
World Steel office, Ho Chi Minh City Urban office building · Ho Chi Minh City, Vietnam · 2019
Dark multi-storey steel frame at the Nam Long Warehouse with metal deck on every floor, seen from below Photo
Nam Long Warehouse Multi-storey frame beside a warehouse · Tay Ninh Province, Vietnam · 2019
Grey multi-storey steel frame of the Hai Trung furniture showroom with cantilevered floors, metal deck and steel stairs Photo
Hai Trung showroom and model house center Showroom with display floors · Vietnam · 2022
Three-storey steel frame of a college of medicine in the Philippines with roof purlins in place and block walls going in Photo
3-storey College of Medicine College building · Philippines · 2023
Aerial view of the multi-storey Nitto Denko factory in Ho Chi Minh City under construction, wrapped in scaffolding and safety net, with a tower crane Photo
Nitto Denko factory Multi-storey factory · Ho Chi Minh City, Vietnam · 2023

Real photos from World Steel

Our own multi-story frame, and the plant that made it

World Steel framed its own office building next to the plant in Vietnam: columns, floor beams, deck and stairs going up level by level. The heavy members behind it come off our welding lines. Not stock images.

Mobile crane lifting a member into a multi-story steel frame Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Columns and floor beams of a multi-story steel frame partway through erection Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Metal floor deck laid on each level of a steel-framed building Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Multi-story steel frame rising next to a fabrication hall Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Looking up at steel floor beams carrying metal deck Photo
Floor beams and metal deck on a World Steel job in southern Vietnam.
Steel stair tower attached to the side of a multi-story frame Photo
Stair tower on a multi-story World Steel frame in southern Vietnam.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Welder looking over the stiffeners and end plate of a heavy column Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.

PEB Studio · real-time production tracking

Watch your floors being made, member by member

Open PEB Studio at any hour to see which columns and beams are cut, welded, coated, released by QC and loaded. Screens below use demonstration data.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

How PEB Studio works

Building in earthquake country?

Multi-story steel for California and high-seismic regions

Seismic Design Categories D to F change everything in a multi-story frame: the system, the connections, the welds, the steel toughness and the inspections. We built a separate guide for it, with the California Building Code, DSA and HCAI review, AISC 341 detailing and AWS D1.8 welding.

The multi-story ecosystem

Products and solutions behind a World Steel multi-story building

The members we make for each level, the engineering and services that come with them, and the industries that build multi-story in steel.

What the package contains

Components in this package

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Mezzanines & Floor Systems

Connections & Anchorage

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.

Talk to an engineer

Send your plans. We tell you how we would frame them.

Our engineers and project managers work in English. Share the floor plans, the site and the use of each level, and we come back with the lateral system, the design basis and a written scope.

Covered in our state guides

Asked by US owners, developers and contractors

Multi-story steel questions and answers

17 straight answers on design, fabrication, fire protection, shipping and what World Steel does and does not do.

Is steel right for my multi-story building? 3 answers

How many stories can you supply steel for?

We fabricate frames from two stories up to mid-rise buildings, including towers World Steel has supplied in Ho Chi Minh City. The real limit is set by the code: the lateral system, the Seismic Design Category and the IBC construction type decide the allowable height for your building, and we size the steel for whatever your architect and engineer settle on.

Why choose steel over wood or concrete for a two- to six-story building?

Steel gives longer column-free bays, a frame that is far lighter than concrete on the foundations, members made in a plant instead of formed on site, and a noncombustible structure that suits IBC Types I and II. Erection is fast once the steel is on site because every piece arrives finished, piece-marked and in erection order.

Can you mix steel with other systems, such as a concrete podium or wood floors above?

Yes. We supply the steel portion only: a steel frame over a concrete podium, a steel transfer level, steel stair and elevator cores, or a steel roof and mezzanines inside another structure. Interfaces such as embeds and anchor rods are drawn on our shop drawings for the trade that installs them.

Design and engineering 4 answers

Who designs the building: you or our engineer?

Either. World Steel can design the full steel structure, with calculations and drawings for your Engineer of Record to review and approve, or fabricate to your Engineer of Record’s design and detail the connections for their review. The split is agreed in writing before the contract.

Which codes do you design multi-story steel to?

IBC 2024 and ASCE 7-22 by default, AISC 360 for members and connections, AISC 341 when the seismic system requires it, and the state code your jurisdiction enforces, such as the California Building Code. Floor vibration and serviceability are checked to AISC design guides your engineer agrees with.

Do you check floor vibration and deflection?

Yes. Offices, clinics and classrooms are sensitive to footfall vibration, so beam depth and spacing are checked for it along with deflection and camber. Your Engineer of Record agrees the criteria, especially for labs or imaging rooms.

What do you need from us to start?

Architectural plans and sections, the structural drawings if your engineer has started, the site address and the intended use of each floor. With only a massing study we can still prepare proposal drawings and a scope.

Fabrication, quality and records 4 answers

Do you make built-up columns and girders, or only rolled sections?

Both. Wide-flange sections are bought to the specified ASTM grade from mills in Vietnam, and heavy columns, transfer girders and deep members are built up from plate on our automatic welding lines when a rolled section is not the best fit.

How do you keep columns plumb and floors level over several stories?

Column lengths, splice locations, base plates and beam seats are modeled in Tekla Structures and checked by QC against the shop drawing, so tolerance does not add up level after level. Erection drawings show the sequence and splice details for the contractor’s erection crew.

What documents do we receive?

Calculations, approval drawings, shop drawings, the Tekla model or IFC on request, EN 10204 3.1 mill certificates by heat, welding procedures and welder qualifications, QC and dimensional records, coating records, packing lists and erection drawings.

Can our inspector check the steel before it ships?

Yes. Your special inspector or owner’s representative can witness hold points in our plant in person, or inspect remotely over live video, and every QC release is logged in PEB Studio with photos.

Fire protection, floors and services 3 answers

Is fireproofing included?

Fire-resistance ratings come from the IBC construction type your architect selects and the listed assemblies they specify. We coordinate coating compatibility with the fireproofing system, and cementitious fireproofing can be supplied by specialists as an option; it is not part of the base steel scope.

Do you supply the metal floor deck and shear studs?

Metal floor deck is an option in this package, and shear stud layouts are shown on our shop drawings. Studs are welded through the deck on site by the erector once the deck is down, as US erection rules (OSHA 1926.754(c)) require.

Can you provide openings in beams for ducts and pipes?

Yes. Web openings are located with your mechanical engineer’s coordinated model, checked in the design and reinforced where needed, then cut in the plant, never torched on site.

Buying, shipping and erection 3 answers

Do you erect the building?

No. World Steel supplies the steel structure only, to US contractors who are our customers and partners. Erection and site work are the contractor’s scope, done from our erection drawings, piece marks and packing lists.

How is a multi-story frame shipped?

Members are sized to fit 40-foot containers wherever the design allows, which is the most economical way to ship, and longer or heavier pieces travel as breakbulk. Everything is packed in erection order, level by level, to the US port named in your quote.

Do you publish prices or lead times?

No. Every multi-story building is engineered for its own site and program, so we quote after a design review, with the delivery plan agreed in writing and worked backward from your site date.

Keep reading

Related pages

Planning a multi-story steel building?

Send the floor plans, the site address and the use of each level. Our engineers confirm the design basis and lateral system with your team, then send a written scope for the steel, made in our plant in Vietnam.