Curved long-span trusses being set during erection

Aviation · sports · assembly · exhibition

Hangars, arenas and long spans: when the clear span is the whole brief

An aircraft hangar or an arena is defined by one number: the clear span. Above about 60 m (200 ft), trusses, deep girders and the details of the door or the roof edge decide the design, and every millimeter of deflection is checked against the doors, the cladding and the people below.

Clear spans
From 40 m (130 ft) to well over 60 m (200 ft)
Hangar doors
Door headers sized with the door supplier’s data
Reference
Aircraft hangar in Thailand, about 200 t
Aircraft hangar, Thailand, structural steel by World Steel World Steel reference 200 t of structural steel Aircraft hangar, Thailand Aviation · Thailand · 2018
Hangars, arenas and long spans at a glanceTypical ranges · not design values
Typical spans
40 to 90 m (130 to 300 ft) clear
Heights
Door heights and tail clearances set the eave
Structural systems
Plane or space trusses, deep built-up girders, arches and curved trusses
Loads that size the steel
Deflection, snow and drift, wind on large doors, hung loads and rigging
Codes and standards
AISC 360, ASCE 7-22, IBC assembly and aircraft hangar provisions
Coating and exposure
Interior, often exposed and architectural; fire rating where required

What makes this project type different

What sizes the steel in hangars, arenas and long spans

Long-span buildings move weight from strength to stiffness. Over a wide clear span, the roof is usually sized by deflection, by ponding and drift, or by the hangar door’s tolerance for movement, and the most efficient answer is often a truss or an arch rather than a heavier beam.

Long members also have to be shipped and erected. Trusses are designed with field splices that fit a container or a breakbulk load, trial-assembled where needed in our plant and delivered with an erection sequence that keeps the structure stable at every stage, which the erector then follows on site.

Deflection and stiffness

Over long spans, stiffness governs more members than strength.

Door headers

Hangar doors need a header girder that moves less than the door can tolerate.

Snow, drift and ponding

Large, flat or curved roofs collect snow and water unevenly.

Wind with doors open

Large openings change the internal pressure the frame must resist.

Hung loads

Scoreboards, rigging, lighting and services hang from the roof.

Splices for shipping

Long trusses are split into pieces that ship and lift well.

Structures and systems

The structures in a typical package, and what we fabricate

Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.

Typical structures and systems for Hangars, arenas and long spans
StructureTypical systemWhat we fabricate
Main roofPlane trusses, space trusses or curved trussesTrusses with bolted or welded field splices
Door headerDeep built-up girder or truss over the doorHeader girder, door guides and supports
Columns and bracingBuilt-up columns and braced end baysColumns, bracing, base plates
Seating and concourseRaker beams and floor framing in arenasRakers, floor beams, stairs
AnnexWorkshops, offices and stores alongsideFrames in the same model

Our advice before you bid

Decisions that save steel, time and rework

  • Choose the door supplier early

    The door’s weight, guides and deflection limit decide the header. Get its data before the roof is designed.

  • Compare truss and girder roofs

    Trusses are lighter; girders are simpler to clad. We price both for your span.

  • Plan the splices with the erector

    Splice locations decide how pieces ship and how the erector lifts them.

  • Ask for a trial assembly where it matters

    Complex trusses can be trial-fitted in our plant before they ship.

  • List the hung loads

    Rigging, scoreboards and services added late are the usual reason long-span roofs are reinforced.

World Steel projects of this type

Built by World Steel, from our own plant

Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.

Aviation · Thailand · 2018

Aircraft hangar, Thailand

200 tabout 200 short tons

Steel structure designed, fabricated and supplied by World Steel.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.

Inside our factory
Looking up at curved steel roof trusses spanning a wide hall Photo
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Red curved roof of a steel building, photographed from the air Photo
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Long-span trusses

Plane and curved trusses fabricated on our shop floor.

Trial fit where needed

Complex assemblies checked in the plant before shipping.

Splices for shipping

Field splices planned for containers or breakbulk loads.

The structural steel ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

The industry behind this guide

World Steel projects of this type

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US contractors

Hangars, arenas and long spans: questions we hear

How wide a clear span can you fabricate?

The span is set by the design, not the shop. Long-span trusses and girders are fabricated in pieces with field splices, so the limits are the design, shipping and erection plan your team agrees.

Do you supply hangar doors?

No. We fabricate the door header, guides and supports to the door supplier’s data.

Can exposed steel have an architectural finish?

Yes. Agree the finish level and coating in the specification, and we fabricate and coat to it.

Can you trial-assemble trusses before shipping?

Yes, where the project requires it. It is agreed in the inspection plan.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.

Does World Steel erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.

A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.

Bidding hangars, arenas and long spans?

Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.