Aviation · Thailand · 2018
Aircraft hangar, Thailand
200 tabout 200 short tons
Steel structure designed, fabricated and supplied by World Steel.
What makes this project type different
Long-span buildings move weight from strength to stiffness. Over a wide clear span, the roof is usually sized by deflection, by ponding and drift, or by the hangar door’s tolerance for movement, and the most efficient answer is often a truss or an arch rather than a heavier beam.
Long members also have to be shipped and erected. Trusses are designed with field splices that fit a container or a breakbulk load, trial-assembled where needed in our plant and delivered with an erection sequence that keeps the structure stable at every stage, which the erector then follows on site.
Over long spans, stiffness governs more members than strength.
Hangar doors need a header girder that moves less than the door can tolerate.
Large, flat or curved roofs collect snow and water unevenly.
Large openings change the internal pressure the frame must resist.
Scoreboards, rigging, lighting and services hang from the roof.
Long trusses are split into pieces that ship and lift well.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Main roof | Plane trusses, space trusses or curved trusses | Trusses with bolted or welded field splices |
| Door header | Deep built-up girder or truss over the door | Header girder, door guides and supports |
| Columns and bracing | Built-up columns and braced end bays | Columns, bracing, base plates |
| Seating and concourse | Raker beams and floor framing in arenas | Rakers, floor beams, stairs |
| Annex | Workshops, offices and stores alongside | Frames in the same model |
Our advice before you bid
The door’s weight, guides and deflection limit decide the header. Get its data before the roof is designed.
Trusses are lighter; girders are simpler to clad. We price both for your span.
Splice locations decide how pieces ship and how the erector lifts them.
Complex trusses can be trial-fitted in our plant before they ship.
Rigging, scoreboards and services added late are the usual reason long-span roofs are reinforced.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Aviation · Thailand · 2018
200 tabout 200 short tons
Steel structure designed, fabricated and supplied by World Steel.
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Long-span trusses
Plane and curved trusses fabricated on our shop floor.
Trial fit where needed
Complex assemblies checked in the plant before shipping.
Splices for shipping
Field splices planned for containers or breakbulk loads.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Photo
Photo
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
The span is set by the design, not the shop. Long-span trusses and girders are fabricated in pieces with field splices, so the limits are the design, shipping and erection plan your team agrees.
No. We fabricate the door header, guides and supports to the door supplier’s data.
Yes. Agree the finish level and coating in the specification, and we fabricate and coat to it.
Yes, where the project requires it. It is agreed in the inspection plan.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.