Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Office block of World Steel standing between two fabrication halls

The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Download center

Every document a US steel submittal asks for, in one place

Certificates, sample drawings, a sample inspection plan and the company profile, ready for your bid, your Engineer of Record and your building official. Download now, request the detailed files, or read them online.

Who is asking?

The right documents for each person on the job

A contractor, an engineer and a building official each ask a different question. Pick who you are sending documents to.

General, design-build and EPC contractors

“Can this fabricator carry a large steel package, and what will the submittal look like?”

Answer it with

Comes with your order

  • Proposal and approval drawings
  • Shop drawings at no extra cost
  • Shipping lists by erection sequence
  • Real-time progress in PEB Studio

The engineer who reviews and approves the steel

“Which code, which loads, which welding procedures, and how complete are the drawings I will review?”

Answer it with

Comes with your order

  • Design calculations for review
  • Approval drawings
  • Welding procedure specifications
  • Answers from our engineers on every comment

Building departments and special inspectors

“Is the plant an approved fabricator, and how is the steel inspected before it ships?”

Answer it with

Comes with your order

  • IAS AC472 certificate for the permit file
  • Inspection and test records
  • Remote inspector access on request
  • Mill certificates traced to each member

Owners, developers and their representatives

“Who is the company behind the steel, and how will my building be documented?”

Answer it with

Comes with your order

  • Project photos from the shop
  • QC records with your building
  • As-shipped document set
  • One fabricator from drawings to shipping

Prequalification and vendor approval teams

“Which certificates are current, who issued them, and can I verify them?”

Answer it with

Comes with your order

  • Certificates with issuer and number
  • Company profile and references
  • EN 10204 3.1 mill certificates, CVN on request
  • A contact in the US time zone

Along the job

Which document comes at which stage

The files here are samples. For your building, World Steel prepares the full set as the job moves from bid to shipping. Erection and site work stay with the US contractor, our customer.

  1. Prequalify

    You check us

    Certificates, company profile, references and a factory visit or video call.

    See the sample
  2. Bid & proposal

    World Steel

    Proposal drawings and a scope list your estimator can price against.

    See the sample
  3. Approval

    Your Engineer of Record approves

    Design calculations and approval drawings, revised until your engineer signs them off.

  4. Fabrication & QC

    World Steel plant

    Shop drawings, the agreed inspection plan, mill certificates and QC records.

    See the sample
  5. Shipping

    World Steel

    Packing lists and marks by erection sequence, so the right steel arrives first.

  6. Erection

    The US contractor, our customer

    Erection drawings and bolt lists for your crew. Erection and site work stay with you.

Download now. Certificates and brochures you can save straight away, no form and no email.

Download with your details. Detailed sample documents: share your name, company, email and phone, then the file is yours. An engineer can walk you through it.

View online. Read it in your browser on any phone or laptop, page by page, with nothing to install.

Read free, download with details. Detailed samples you can read in full online; to keep a copy, share your email, company and phone.

World Steel USA document list: title, issuer and number, validity, format, how to get it
Document Issued by Valid to Format Access Get the document
Certificates & accreditations14 documents
JPG IAS AC472 certificate of accreditation, valid to August 1, 2027 The certificate in force today: Part A and Part C, with Smith-Emery still conducting the plant inspections.
IAS (International Accreditation Service)No. MB-268 JPG · 172 KB · 1 page · English Free download Download View
PDF ISO 9001:2015 certificate, quality management system World Steel's quality management system, audited and found to conform to ISO 9001:2015. Certified since September 2023.
Guardian Independent Certification Ltd (UKAS)No. 786902 PDF · 327 KB · 1 page · English Free download Download View
PDF ISO 14001:2015 certificate, environmental management system World Steel's environmental management system, audited and found to conform to ISO 14001:2015. Certified since September 2023.
Guardian Independent Certification Ltd (UKAS)No. 799559 PDF · 337 KB · 1 page · English Free download Download View
PDF ISO 45001:2018 certificate, occupational health and safety World Steel's occupational health and safety system, audited to ISO 45001:2018. Certified since September 2023.
Guardian Independent Certification Ltd (UKAS)No. 721070 PDF · 331 KB · 1 page · English Free download Download View
PDF ISO 3834-2:2021 certificate, welding quality requirements Welding certification to ISO 3834-2:2021 for steel building fabrication: processes 121 and 136, plate 3 to 40 mm.
GIC Vietnam (Guardian Independent Certification)No. 730264 PDF · 939 KB · 2 pages · English and Vietnamese Free download Download View
PDF EN 1090-1 factory production control certificate, up to EXC3 BSI certificate (Notified Body 2797) for factory production control to EN 1090-1, structural steelwork up to EXC3.
BSI Group The Netherlands B.V. (Notified Body 2797)No. 2797 CPR 827443 No fixed expiry PDF · 364 KB · 2 pages · English Free download Download View
PDF AS/NZS 5131:2016 Benchmark certificate, structural steelwork to CC3 BSI Benchmark certification to AS/NZS 5131:2016 for structural steelwork in buildings and bridges, up to CC3.
BSI Group ANZ Pty LtdNo. BMP 827566 PDF · 268 KB · 2 pages · English Free download Download View
JPG IAS AC472 certificate of accreditation, valid to August 1, 2026 The certificate now lists both sites by address: the plant (Part A) and the design office (Part C).
IAS (International Accreditation Service)No. MB-268 JPG · 173 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2025 The in-plant program now recognized under the 2021 and 2024 IBC as well.
IAS (International Accreditation Service)No. MB-268 JPG · 150 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2024 Fifth certificate in a row, still naming Smith-Emery for periodic plant inspections.
IAS (International Accreditation Service)No. MB-268 JPG · 164 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2023 Another year of audits closed, another renewal from IAS.
IAS (International Accreditation Service)No. MB-268 JPG · 157 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2022 Renewed again, with the program tied to IBC §1704.2.5.1 in the 2015 and 2018 editions.
IAS (International Accreditation Service)No. MB-268 JPG · 147 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2021 Renewed after a full year of audits, with the same Part A and Part C scope.
IAS (International Accreditation Service)No. MB-268 JPG · 117 KB · 1 page · English View online View online
JPG IAS AC472 certificate of accreditation, valid to August 1, 2020 The first certificate in the series: Part A fabrication and Part C design under one program number, MB-268.
IAS (International Accreditation Service)No. MB-268 JPG · 80 KB · 1 page · English View online View online
Sample submittal documents4 documents
PDF Sample Inspection and Test Plan (ITP), PEB warehouse Free download: a sample of the ITP World Steel issues with a quotation: every check from shop drawings to packing, with hold, witness and review points for each party.
– – PDF · 129 KB · 5 pages · English and Vietnamese Free download Download View
PDF Sample proposal drawings for a US steel structure Free download: the proposal drawings World Steel sends with a quotation: general notes, plans, elevations and sections.
– – PDF · 12.1 MB · 15 pages · English Free download Download View
PDF Sample Design Calculation Report, US codes with seismic design Read free online: a sample of the Design Report for your submittal, from codes and loads to frame and connection checks. Share your details to download.
– – PDF · 1.7 MB · 31 pages · English Read free, download with details Read Download
PDF Sample approval drawings (APD) for a steel structure Download with your details: a full World Steel approval drawing set for your submittal, 56 sheets from anchor bolts to frames, staircases and mezzanines.
– – PDF · 8.2 MB · 56 pages · English and Vietnamese Download with your details Get the file
Brochures & catalogs1 document
PDF World Steel Group company profile 2026 Free download: who we are, our IAS AC472-accredited plant in Vietnam, standard steel frame systems, materials, quality control and typical projects.
– – PDF · 15.8 MB · 56 pages · English Free download Download View

Certificates & accreditations

IAS AC472 accreditation certificates and the quality records behind them, for your submittal and your building official.

Sample submittal documents

Sample calculation packages, drawing sets, mill certificates and QC records, so your Engineer of Record knows what to expect.

Brochures & catalogs

Company profile, product catalogs and building system brochures for your team and your client.

No document matches this filter.

Ask us for it

For your own building

A full document set, even on a 5,000-ton package

The files here are samples. For your building, World Steel prepares the design calculations, approval drawings and shop drawings, then the mill certificates and QC records as your steel is fabricated in our own plant in Vietnam. Calculations and drawings come ready for your Engineer of Record's review and approval, and you follow production in PEB Studio in real time.

  • 2,500 tfabricated a month in our own plant
  • 5,000 tlargest published job, Sunpro Steel
  • 20,000 m²plant in Tay Ninh, Vietnam
  • 300+people in design, shop and QC

Q&A

Questions about our documents

Certificates and verification 3 answers

Are these the current certificates?

Yes. Each certificate shows who issued it, its number and its validity date in the table, and the file is the certificate as issued. Older IAS AC472 certificates stay listed for your records, and expired ones are marked.

How can I verify a certificate?

Every certificate carries the issuing body and the certificate number. You can check it with the issuer directly, or ask us and we send the contact details of the certification body.

Does your building official accept a plant in Vietnam?

IAS AC472 is the fabricator inspection program US building officials use to waive special inspection in the shop. World Steel has held it since 2019, as the first and only plant in Vietnam, and is audited twice a year. Acceptance is always the building official's decision, so share the certificate early.

Samples and access 3 answers

Why do some files ask for my details?

Free files download straight away. A few detailed samples ask for your name, company, email and phone so an engineer can walk you through them and answer questions on your project. We do not share your details.

Are the sample drawings from a real job?

Yes. The sample proposal drawings come from a real World Steel job, with the project name, location and engineer details removed.

Can I read a file without downloading it?

Yes. Files marked View online or Read free open in your browser page by page, on a phone or a laptop. Read free files, such as the sample Design Report, can also be downloaded once you share your details.

Documents for your own project 3 answers

What documents come with my order?

Design calculations, approval drawings and shop drawings, then the agreed inspection plan, mill certificates and QC records as your steel is fabricated, and packing lists by erection sequence. Shop drawings are included at no extra cost.

Who approves and seals the drawings?

World Steel designs and fabricates. Your Engineer of Record reviews and approves the drawings, and any PE seal and the permit stay with you, the US contractor.

Can our inspector follow the fabrication?

Yes. The inspection items and rates are agreed with you for each project, remote inspector access is available on request, and you can follow progress in real time in PEB Studio.

Need a document that is not listed?

Tell us what your client or building official is asking for. We will send the certificate, sample or record that answers it.