Mining steel · Storage and load-out

Covering the stockpile and loading out the product

Ore and concentrate stockpiles are covered to control dust, keep moisture out and protect the reclaim system. The covers are long-span structures with a tripper or stacker gallery along the ridge, and the load-out at the end of the line puts heavy bins over rail or truck lanes. We design and fabricate both.

Three common cover forms

Which stockpile cover fits your pile

Long-span gable frames

Built-up tapered or truss frames for rectangular piles and reclaim by front-end loaders or bridge reclaimers.

A-frame truss buildings

Trusses that follow the angle of repose of the pile, with a stacker or tripper gallery at the ridge.

Curved truss covers

Arched long-span trusses for very wide piles, built from repeated truss segments.

The pile sets the shape

Shape the building around the material

The width and height of a stockpile cover come from the material: its angle of repose, the live capacity the owner wants and the reach of the stacking and reclaim equipment. When the steel follows the pile, less building encloses the same tonnage of ore. We compare frame forms for your pile and let your Engineer of Record decide.

The tripper or stacker gallery along the ridge is a conveyor gallery hung from or supported on the frames, so the roof structure carries belt loads as well as wind, snow and dust build-up. Inside the cover the steel lives in dust and moisture, which can be corrosive with sulfide ores or salts; galvanizing or a duplex system is common.

At the load-out, surge bins and their supports sit over rail tracks or truck lanes. Those members carry heavy, changing loads from material flowing in and out, and are designed for them with the bin designer’s data.

Load cases

What a stockpile cover is designed for

LoadSourceNote
Tripper or stacker galleryConveyor designerCarried on the frames along the ridge
Wind on a large enclosureASCE 7-22 for your siteOpenings at reclaim ends change the internal pressure
Snow and driftASCE 7-22 for your siteImportant on wide covers in northern states
Material pressure on wallsOwner’s criteria and your EORPush walls are usually concrete; the steel stays above them
Dust build-upOwner’s criteriaAn allowance for settled material on ledges and purlins

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Cover frame and ridge gallery design to US codes for your EOR’s review
  • Bin support and load-out tower steel
  • Roof and wall panels made in Vietnam, when you want them
  • Galvanizing or duplex coating for the exposure

The US contractor, our customer, and others

  • Stacker, reclaimer and bin equipment
  • Push walls, foundations and reclaim tunnels
  • Erection and cladding installation
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a mine.

Red curved roof of a steel building, photographed from the air Photo
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Open floor of a clear-span warehouse with no interior columns Photo
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Stockpile & load-out: questions we hear

How wide a stockpile cover can you build?

Span depends on the frame form, the loads and the site. We design long-span frames and trusses from built-up plate in our plant and compare options for your pile; your Engineer of Record approves the choice.

Do you supply the reclaim tunnel?

Reclaim tunnels are usually concrete or corrugated steel by others. We supply the structural steel above ground: the cover, the galleries, the feeders’ support steel and the access.

Can you supply the cladding too?

Yes. Roof and wall panels, trims and louvers made in Vietnam can ship with the frame, or we supply the frame only.

Does World Steel provide shop drawings for mining steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes, the owner’s design criteria and the equipment data govern, and your Engineer of Record confirms them for each project. World Steel has no published mining project.

Talk to our mining steel team

Send the general arrangement drawings, the owner’s structural criteria and the area you are pricing. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.