In the US market
Corporate flight departments, FBOs and regional airports keep adding hangar and maintenance space as fleets grow. Airport sites are open and exposed, and the airport sponsor often adds its own design and approval steps.
Start with the aircraft
A hangar is defined by the aircraft it must hold. We turn your fleet data into a frame, and the frame into members fabricated in our Vietnam plant.
Wingspan, tail height and the largest aircraft you expect set the clear opening and the eave.
The header above the door is designed for the door manufacturer’s loads and deflection limits.
See the steel →Trusses or plate frames carry the roof across the full opening without interior columns.
See the steel →Roof and walls are checked for the internal pressure a large open door creates in high wind.
See the steel →Corporate flight departments, FBOs and regional airports keep adding hangar and maintenance space as fleets grow. Airport sites are open and exposed, and the airport sponsor often adds its own design and approval steps.
Wide clear spans for the design aircraft, a door header framed for the door manufacturer’s loads, roof and walls checked for the pressures around a large open door, and fire protection coordinated with your fire protection engineer.
The long-span frame and door header are designed together and documented for your Engineer of Record. The header and jambs are sized for the loads and deflection limits your hangar door manufacturer provides.
What you can build
Made in our Vietnam plant
Products · Steel buildings
Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.
Photo
Wide-span truss or plate frame with a door header
Starts from: Aircraft Hangar Buildings
Photo
Photo
Photo
Building packages
Planned steel building packages for the building types US owners ask for most.
See packages →Engineering
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Wingspan, tail height and the clear door opening fix the span and eave before any steel is sized.
The header above a bifold or hydraulic door is designed with the door manufacturer’s loads and deflection limits.
Hangar fire protection (NFPA 409) can affect roof framing and drainage; your fire protection engineer confirms the requirements.
Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.
Solutions · End to end
One partner carries your aviation & aerospace facilities building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Steel building design →Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.
Inside the plant →Watch each of your members move through fabrication and QC release, in real time.
PEB Studio →Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.
Vietnam to USA →Piece marks, erection drawings and packing lists let your erector start straight away.
How we work →PEB Studio
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Demonstration data
The Aviation & Aerospace Facilities ecosystem
Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.
ProductsSteel buildings
View all →ProductsBuilding systems
View all →ProductsComponents
How we workSolutions
How we helpServices
State guides
Projects
Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.
Questions and answers
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
The design aircraft or its wingspan and tail height, the door type and opening, the airport location and any sponsor requirements. From that we size the span, eave and header.
The span follows the aircraft and the door opening. We design clear-span rigid frames or trusses for the width you need and check deflection at the door header as closely as strength.
Yes. We size the door, header and clear height for the largest aircraft you plan to store and check the floor plan for the parking layout your operator wants.
Yes. Lean-to shops, two-story offices and mezzanines are framed with the hangar in the same model so the connections are designed, not improvised.
The door is designed by its manufacturer. We design the header and jambs for the loads and deflection limits that manufacturer gives us.
Bi-fold, hydraulic, sliding and stacking doors. Each puts different loads on the header and the end frame, so the door is chosen before we finalize the steel.
Your fire protection engineer, under NFPA 409. We coordinate roof framing, drainage and supports with their design.
Yes. Hoists, monorails and fall-arrest anchors are added to the roof model with the loads their suppliers give, so the steel is designed for them before fabrication.
Yes. Built-up girders and trusses are fabricated in our Vietnam plant in shippable pieces with bolted splices, and trial-fit where the shop drawings call for it.
Member lengths are planned around containers, flat-racks and the road route to the airfield, with splices placed where they suit both the structure and the truck.
Yes. PEB Studio shows each member’s cutting, welding, coating and QC release in real time, which helps plan erection around airport operations.
Yes. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month, enough to run a terminal support building and several hangars in parallel.
No. World Steel designs, fabricates and supplies the steel. Erection on the airfield is the scope of the US contractor, our customer.
Your Engineer of Record reviews and approves our calculations and drawings, and the PE seal and permit stay with the US team.
Grant programs can carry steel sourcing rules. We ask the sponsor or contractor to confirm them with the funding agency before we quote and make no eligibility claim.
IBC 2024 and ASCE 7-22 loads with AISC 360, or the code your jurisdiction has adopted, plus the criteria your Engineer of Record sets for the door and the aircraft.
Neighboring industries
Covered in our state guides
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.