Multi-story steel buildings for California and other high-seismic regions
A mid-rise in Los Angeles, the Bay Area or San Diego carries earthquake demands few buildings anywhere face. We fabricate its seismic frames, connections and floors to AISC 341 and AWS D1.8 in our own plant in Vietnam, with every weld, heat number and inspection recorded for your submittal.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a California port. World Steel supplies the steel structure to US contractors, who erect it.
Why multi-story is different in earthquake country
Six things an earthquake asks of a multi-story steel frame
A single-story warehouse is light and simple to brace. Stack five floors of concrete slab on a steel frame in Seismic Design Category D and every one of these becomes a design decision.
Mass on every floor
Each floor slab is a heavy mass that the frame must hold back as the ground moves, so forces grow with every level you add.
Story drift
Floors move sideways relative to each other. Drift limits protect facades, stairs and partitions, and often set member sizes more than strength does.
Soft and weak stories
Open ground floors for retail, lobbies or parking can concentrate damage, so ASCE 7 restricts these irregularities in the higher categories.
Diaphragms and collectors
Floors must deliver their earthquake force to the braced or moment frames, through collectors and chords designed for amplified forces.
Capacity design
Chosen members yield in a controlled way while connections, columns and foundations stay stronger than what that yielding can deliver.
Nonstructural anchorage
Stairs, facades, ceilings and equipment need seismic anchorage too, and the steel has to give them something to attach to.
The steel systems that carry multi-story buildings through an earthquake
In the higher categories, ordinary systems are limited or not allowed for taller buildings. These are the high-ductility systems California engineers choose, and what we make for each.
Special concentrically braced frames
How it behaves
Braces yield in tension and buckle in compression while beams, columns and gussets stay elastic.
Typical use
Offices, schools and lodging with braced bays around cores and stairs.
What World Steel fabricates
Brace members, gusset plates with the required hinge clearance, beams and columns of the braced bays.
Buckling-restrained braced frames
How it behaves
Braces yield in both tension and compression without buckling, giving stable, repeatable energy dissipation.
Typical use
Mid-rise buildings that need slim, efficient braced bays.
What World Steel fabricates
The frame and gusset connections around braces from a specialist BRB supplier, detailed to its tested connection.
Special moment frames
How it behaves
Beams form plastic hinges next to the columns through prequalified connections, leaving bays open.
Typical use
Ground-floor retail, lobbies and facades with large openings.
What World Steel fabricates
Beams with reduced beam sections or end plates to AISC 358, columns with continuity plates and doublers.
Eccentrically braced frames
How it behaves
A short link beam between braces yields in shear or bending and protects the rest of the frame.
Typical use
Buildings that need door or corridor openings through braced bays.
What World Steel fabricates
Link beams with stiffeners, braces and their connections, with protected zones marked.
Dual systems
How it behaves
A moment frame backs up a braced frame and carries a share of the earthquake load on its own.
Typical use
Taller buildings where the code requires a backup system.
What World Steel fabricates
Both families of members in one Tekla model, with consistent splices and erection order.
Go deeper
All the systems
Every steel seismic system with its R factor and height limits, side by side.
Read with ASCE 7-22 Table 12.2-1 for each system’s coefficients and height limits. Your Engineer of Record selects the system; we fabricate it to AISC 341, AISC 358 and AWS D1.8.
The California layer
California’s own rules on top of the model codes
Beyond ASCE 7 and AISC 341, a California multi-story building meets state amendments, local amendments and, for some buildings, state review.
California Building Code
Title 24, Part 2, based on the IBC with California amendments; the 2025 edition took effect on January 1, 2026. We confirm the edition at your permit date.
Local amendments
Los Angeles, San Francisco and other jurisdictions amend the CBC, often for seismic design. Your Engineer of Record confirms which ones apply to your site.
DSA for public schools
Public K-12 schools and community colleges are reviewed by the Division of the State Architect, with its own testing and inspection program.
HCAI for hospitals
Hospitals and skilled nursing facilities are reviewed by HCAI (formerly OSHPD). Outpatient clinics are usually reviewed locally.
Fabricator approval
The City and County of Los Angeles run fabricator approval programs. World Steel holds none of them, so we plan in-plant special inspection that your building official accepts.
Near-fault sites and soils
Many California sites are close to active faults or on soft soils; the site class and any site-specific ground motion study come from your geotechnical engineer.
The seismic requirements live in the shop as much as in the calculations. These are the checks every member of the seismic system goes through, recorded in PEB Studio.
Demand-critical welds
Identified on the shop drawings and welded to AWS D1.8 with notch-tough filler metal by qualified welders.
Toughness by heat
Thick flanges and plates in the seismic system ordered with Charpy V-notch testing and 3.1 certificates traced to piece marks.
Protected zones
Kept free of welds, holes and attachments in the plant, and marked on the steel on request.
Prequalified geometry
Reduced beam section cuts, weld access holes, end plates and stiffeners made to the AISC 358 limits on the drawings.
Bolted seismic joints
Pretensioned high-strength bolts with faying surfaces prepared and masked to the specified slip class.
Tests and records
Ultrasonic testing of complete-joint-penetration welds and the other Chapter J tasks, recorded member by member in PEB Studio.
Calculation package and drawings for your Engineer of Record’s review and approval
Shop drawings showing seismic members, demand-critical welds and protected zones
Welding procedure specifications and welder qualifications to AWS D1.8
EN 10204 3.1 mill certificates by heat, with Charpy V-notch results
Ultrasonic and other nondestructive test reports for seismic welds
Dimensional and QC release records with photos for every member
Bolt, faying-surface and coating records for the seismic joints
Packing lists by level and erection drawings for the contractor’s crew
Accredited plant
The first and only IAS AC472 fabricator in Vietnam
Written procedures for design and fabrication inspection, audited by IAS. Your building official may accept it under IBC 1704.2.5 for shop special inspection; only they can decide.
Multi-story steel we have designed, made and shipped
A US-code building in the US territory of Guam with seismic design by World Steel, and city towers built with our steel. The bare frames of our other multi-story work are in the ledger below.
Past World Steel work, shown for the structure type. Projects outside the US are not US sites and do not describe the seismic criteria of any California project.
Frames we have built
Multi-story steel frames we have designed and fabricated
These frames are outside California and are shown for the structure type, not as seismic US projects. What carries over to a California job is how the frame is modelled, made and checked in our plant, which fabricates 2,500 t of structural steel a month.
Multi-storey factory · Ho Chi Minh City, Vietnam · 2023
The frame · A large multi-storey factory block under construction, wrapped in scaffolding and safety net, with a tower crane on site.
Carries over · Multi-storey industrial floors at a large footprint. Open the project
Real photos from World Steel
Where seismic multi-story steel is made and checked
Our own multi-story office frame, heavy built-up members on the welding lines, and the inspection and traceability behind them, in our plant in Tay Ninh Province, Vietnam. Not stock images.
Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Photo
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Photo
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Photo
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Seismic multi-story steel is routine along the whole West Coast and in the Intermountain West. Each state guide covers its code, ports and site conditions.
Products and solutions behind a seismic multi-story building
The frames, braces, connections and floors we make for each level, the engineering and services that come with them, and the industries that build multi-story in earthquake country.
Asked by California owners, contractors and engineers
Seismic multi-story questions and answers
15 straight answers on California code and review, seismic systems, welding, steel toughness, inspection and what World Steel does and does not do.
California code and review4 answers
Which code will my California multi-story steel building be designed to?+
The California Building Code in force on your permit application date. The 2025 edition (Title 24, Part 2) took effect on January 1, 2026 and is based on the 2024 IBC, which uses ASCE 7-22 for seismic loads and AISC 341-22 for steel seismic systems. Cities such as Los Angeles and San Francisco add local amendments, so we confirm them with your Engineer of Record first.
Can you supply steel for a public school or a hospital in California?+
We can fabricate to the design, but these projects follow state review: the Division of the State Architect (DSA) for public K-12 schools and community colleges, and HCAI for hospitals and skilled nursing facilities. Both set their own testing and inspection programs, so we agree the shop inspection plan with your design team before we price the steel.
Is World Steel on the Los Angeles fabricator approval list?+
No, and we do not claim it. The City and County of Los Angeles run their own fabricator approval programs; elsewhere the building official decides whether shop work needs special inspection. Where approval is not held, the usual path is in-plant special inspection by an agency your building official accepts, which our plant supports in person or over live video.
Who seals the calculations for a California permit?+
The US contractor, our customer, and their Engineer of Record. World Steel designs and fabricates the steel structure and delivers the calculations and drawings they review, approve and seal. If your Engineer of Record designs the building, we fabricate to that design.
Systems and detailing4 answers
Which steel lateral system suits a mid-rise building in Seismic Design Category D?+
Usually special concentrically braced frames, buckling-restrained braced frames or special moment frames, sometimes combined as a dual system. ASCE 7-22 sets height limits for each system by category, and your Engineer of Record makes the final choice from the floor plan, the architecture and the site.
Do you fabricate buckling-restrained braces?+
No. Buckling-restrained brace cores and casings come from specialist BRB suppliers that test them to AISC 341. We fabricate the frame around them: beams, columns, gusset plates and connection plates, detailed to the supplier’s tested connection.
Which moment connections can you make?+
Connections prequalified in AISC 358 that suit shop fabrication, such as the reduced beam section and bolted extended end-plate connections, plus others your engineer specifies. Every cut, weld, stiffener and continuity plate is drawn on the shop drawings for approval.
What is a soft or weak story, and why does it matter here?+
A ground floor that is much more flexible or weaker than the floors above, common under retail, lobbies and parking. Earthquakes concentrate damage there, so ASCE 7 restricts these irregularities in the higher categories. The answer is usually a stiffer frame or extra braced bays at the ground level, which we model from the start.
Welding, steel and inspection4 answers
Are your welds made to AWS D1.8?+
Yes. Our shop welding procedures and welders are qualified to AWS D1.8, the seismic supplement to AWS D1.1, for demand-critical and other seismic welds. Procedure specifications and welder qualification records go into your submittal.
Do you supply Charpy V-notch results for thick members?+
Yes, on request. AISC 341 calls for notch toughness in thick flanges and plates of the seismic system, and our Vietnamese mills issue EN 10204 type 3.1 certificates with Charpy V-notch results when the order asks for them.
Can our special inspector check the seismic welds in Vietnam?+
Yes. Your inspector or agency can witness hold points at our plant in person, or remotely over live video, and review records online. Ultrasonic testing of complete-joint-penetration welds and the other tests in AISC 341 Chapter J are recorded member by member.
How are protected zones handled?+
Protected zones are shown on the shop drawings, so nothing is welded, drilled or attached there in the plant. On request we also mark them on the steel so trades on site keep them clear.
Buying and building3 answers
Do you erect the building in California?+
No. World Steel supplies the steel structure only, to US contractors who are our customers and partners. Erection is the contractor’s scope, including field bolting, field welding and field quality control, with our engineers available for questions.
Where is the steel made?+
In World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, with steel mainly from mills in Vietnam, ordered to the ASTM grades your project names. It ships to the Port of Los Angeles, Long Beach, Oakland or San Diego. Our Westminster, California office is an office, not a plant.
Do you publish prices or lead times for seismic buildings?+
No. Each seismic building is engineered for its own site and system, so we quote after a design review, with the delivery plan agreed in writing and worked backward from your site date.
Code facts on this page summarize the California Building Code, ASCE 7-22, AISC 341, AISC 358 and AWS D1.8 for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Planning a seismic multi-story building?
Send the plans, the site address and the soils report if you have it. Our engineers confirm the seismic system and review path with your Engineer of Record, then send a written scope with every record you will receive.