Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Building package · Self-storage

Same bay. Same door. Hundreds of times.

Self-storage rewards repetition. World Steel, a structural steel fabricator producing 2,500 t (5.5 million lb) a month in our own plant in Vietnam, sizes one bay to your unit mix, repeats it down every building and ships the steel packed building by building to your US contractor.

Every member is made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472. Westminster, California is our US office, not a plant.

Three-story steel frame by World Steel during erection in the Philippines
Photo: a three-story World Steel frame in the Philippines, the structure type of multi-story storage.
Building types
Drive-up · interior corridor · multi-story
Designed to
IBC 2024 · ASCE 7-22 · AISC 360
Capacity
2,500 t (5.5 million lb) of structural steel a month
Shop drawings
Included at no extra charge

Bay explorer

Pick a bay spacing and watch the row repeat

A 90 m (295 ft) drive-up row, drawn to scale. Frames should land on partition lines, never in the middle of a door. The bay that fits your unit mix best is the one we design.

90 m (295 ft) one bay: 6 m (20 ft) bays
16frame lines, all identical
303 m (10 ft) unit doors
0frames in the middle of a door

Two 3 m (10 ft) doors between frames. Geometry only: the frame size, steel weight and price come from your loads and site.

90 m (295 ft) one bay: 7.5 m (25 ft) bays
13frame lines, all identical
243 m (10 ft) unit doors
121.5 m (5 ft) locker units
0frames in the middle of a door

Two 3 m doors and a 1.5 m (5 ft) locker unit, so frames still land on partition lines. Geometry only: the frame size, steel weight and price come from your loads and site.

90 m (295 ft) one bay: 9 m (30 ft) bays
11frame lines, all identical
303 m (10 ft) unit doors
0frames in the middle of a door

Three 3 m doors between frames: fewer frames down the row. Geometry only: the frame size, steel weight and price come from your loads and site.

Common US unit sizes

Units your frame is laid out around

Metric first, with the size names US renters know.

1.5 × 3 m

5 × 10 ft

Lockers and small units

3 × 3 m

10 × 10 ft

The most common unit

3 × 6 m

10 × 20 ft

Vehicles and business storage

3 × 9 m

10 × 30 ft

Boats, RVs and contractors

Why repetition pays

Designed once, fabricated many times

One connection, repeated

The same bolted detail at every frame means faster erection and fewer mistakes on site.

Dense, simple loads

Identical members pack tightly into containers, bundled per building.

Phase two from the same model

Later buildings reuse the drawings, frames and details of the first.

Checked once, made many times

A frame type that passes QC once is fabricated the same way for every bay.

Fabrication capacity

Whole storage portfolios, building after building

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

Stack it when land is expensive

Multi-story storage on a strong steel frame

Two- and three-story storage needs columns, floor beams and deck sized for storage loads, a freight elevator opening and stairs. These World Steel frames show the structure type. Tap a photo to open it.

Multi-story steel buildings
Three-story steel frame with floor beams in place Photo Three-story frame, Philippines
Steel columns and beams of a three-story building Photo Floors on steel beams
Dark steel frame erected on site in Thailand Photo Phuket House, Thailand
Crane lifting steel members into a frame in Thailand Photo Erection by local crews
Metal floor deck laid on steel beams Photo Metal deck on steel beams

Projects outside the US, shown for the structure type; they are not US sites.

Two ways to store

Drive-up or climate-controlled: what changes

Most of the difference is in the envelope and the hallways, not the frame. Switch between the two to see what we change.

Storage type
AISLEAISLE BACK-TO-BACK UNITS, DOORS OUTSIDE

Drive-up rows

Customers park at the door.

Frame
Single-story rows of short, repeated bays
Envelope
Single-skin roof and walls, ventilated
Access
Roll-up unit doors straight to the drive aisle
Fit-out
Unit partitions and doors from the storage system supplier
Phasing
Add rows as the site leases up
HALLWAY RTU INSULATED PANELS

Climate-controlled

Units off conditioned hallways.

Frame
Single or multi-story, sized for insulated panels and rooftop units
Envelope
Insulated roof and wall panels, tight joints
Access
Lobby, loading bay and interior hallways; elevator on multi-story
Fit-out
Hallway and partition framing coordinated with the unit mix
Phasing
Often the second building on a drive-up site

Repetition in our plant

Identical members, made in one run

Real photos from World Steel’s plant in Vietnam: frames for small buildings coated, stacked and bundled per building. Tap to open full size.

Blue-coated frame members stacked in the World Steel plant Photo
Rows of primed steel members in the fabrication hall Photo
Blue steel members lined up in the plant Photo
Primed rafters in rows on the shop floor Photo
Coated steel members ready for loading Photo
Fabricated steel frames in the World Steel plant Photo
Worker checking primed members Photo
Stacked blue members in the plant Photo

Projects outside the US are shown for the structure type; they are not self-storage facilities or US sites.

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

The worry: “Will steel designed overseas pass US plan check?”

Designed to US codes, ready for your engineer’s review

We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.

The worry: “I can’t see the quality from across the Pacific.”

An accredited plant you can inspect, live

Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.

The worry: “Will the materials be traceable to the grade on the drawings?”

Mill certificates by heat number

Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.

The worry: “What if pieces don’t fit when they reach the site?”

Modeled, approved, then measured

Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.

The worry: “How will I know where my order really is?”

Real-time tracking in PEB Studio

You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.

The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”

Packed in erection order, listed per container

Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.

The worry: “Who handles customs and duties?”

Incoterm and importer of record in writing

Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.

The worry: “Time zones and language will slow everything down.”

One English-speaking project manager

Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.

The worry: “Who erects it, and who stands behind the field work?”

Your US contractor erects, with our drawings

World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.

The worry: “Who is responsible for the design?”

Scope split agreed before you sign

We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.

  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

What the package contains

Components in this package

Self-storage rewards repetition: the same bay, the same unit door and the same detail, hundreds of times. We match frame spacing to your unit mix, keep the connection count low, and detail climate-controlled buildings with insulated panels. Partition systems and roll-up doors are coordinated with your chosen supplier.

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Wall & Cladding System

Doors & Building Openings

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.
  • Unit partition systems and unit doors are confirmed per project.

Talk to an engineer

Send the site plan and the unit mix.

Our engineers work in English. We propose the bay spacing, the frame type and the building split for your site, then send a written scope for the steel.

Covered in our state guides

Asked by storage owners, developers and contractors

Self-storage steel questions and answers

14 answers on layout, multi-story and climate-controlled storage, codes and shipping.

Layout and unit mix 3 answers

How do you fit the frame to our unit mix?

Send the unit mix and the site plan. We pick a bay spacing that divides cleanly into your door widths and unit depths, so frames land on partition lines and the same connection repeats down the building. The bay explorer on this page shows the idea.

Can you do drive-up and interior-corridor buildings?

Yes. Single-story drive-up rows, interior-corridor buildings with a central hallway, and mixed sites with both are all framed the same way: repeated bays with the corridor or the drive lane set by your layout.

Do you supply the unit partitions and roll-up doors?

Partition systems and roll-up doors usually come from specialist self-storage suppliers you choose. We coordinate with their layout and supply the framing, the door openings and the opening reinforcement. Roll-up doors can be added to our package on request, with ratings confirmed per product.

Multi-story and climate-controlled storage 3 answers

Can you supply steel for a two- or three-story storage building?

Yes. Multi-story storage needs columns, floor beams and metal deck designed for storage live loads, a freight elevator opening and steel stairs. We design and fabricate that frame the same way as our multi-story office and school buildings.

What changes for climate-controlled storage?

Insulated metal panels or insulated roof and wall systems, careful detailing at the eaves and openings, and a vapor control layer where the climate calls for it. We supply the panels with the frame if you want one package.

Can we add a building later?

Yes. Later phases reuse the same bay, frame and connection details, and we keep the drawings so a phase two order starts from your phase one model.

Design and codes 2 answers

Which codes do you design self-storage to?

IBC 2024 and ASCE 7-22 by default, or your jurisdiction’s edition, AISC 360 and AISI S100 for hot-rolled and cold-formed members, and MBMA practice for the metal building system. Standards are what we design to; the building official issues the permit.

Who approves and seals the drawings?

Your Engineer of Record reviews and approves the calculations and drawings we prepare. The approval, the PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.

Climate control and conversions 3 answers

What changes in the steel for climate-controlled storage?

The envelope more than the frame: insulated roof and wall panels, a tighter building, interior hallways and partition framing. The frame is sized for the heavier insulated panels and any rooftop units for the HVAC.

Can a drive-up site add a climate-controlled building later?

Yes. Many operators open with drive-up rows and add a climate-controlled building as the site fills. We keep the same details and bay sizes so the second building matches the first.

Do storage buildings need sprinklers?

It depends on the fire area, the number of stories and your jurisdiction. Self-storage is a storage occupancy under the IBC, and your code consultant or architect sets the fire separations and sprinklers. We frame for the sprinkler piping loads they give us.

Buying, shipping and erection 3 answers

Do you erect the buildings?

No. World Steel supplies the steel structure, and panels if you want them. Erection, slabs, partitions and site work are the scope of the US contractor, our customer.

How is a large self-storage order shipped?

Repeated members pack densely into 40-foot containers, bundled by building and by erection sequence, so each building on the site can be erected from its own containers.

Do you publish prices?

No. Send the site plan and unit mix and we return a written scope and quotation.

Keep reading

Related pages

Planning a self-storage site?

Send the site plan and unit mix. We size one bay to fit it, repeat it across every building and send a written scope for the steel, made in our plant in Vietnam.