New York · Codes
Structural steel and New York’s two building code systems
New York has two code systems. Everywhere outside New York City, the New York State Uniform Fire Prevention and Building Code applies, based on the ICC codes and enforced by cities, towns and counties. Inside the five boroughs, the New York City Construction Codes apply, enforced by the Department of Buildings. The first job on a New York project is knowing which one the site follows.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of New York and New Jersey for your New York site.
- Outside NYC
- NYS Uniform Code
- Inside NYC
- NYC Construction Codes
- Enforced by
- Local code officials or DOB
- Our part
- Code edition on sheet one
Why it matters
Two systems, one clear design basis
A distribution center in the Hudson Valley is reviewed by the local code official under the Uniform Code. A multi-story building in Brooklyn is filed with the Department of Buildings under the NYC codes, with its own special inspection rules and filing steps. The steel design has to name the system and edition before anything else.
We confirm the code system and edition with your Engineer of Record before modeling, and state the code basis, the snow, wind and seismic loads and the design criteria on the first calculation sheet.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code system | NYS Uniform Code or NYC Construction Codes, from the site address |
| Code edition | The edition in force and any local amendments |
| Snow | Ground snow, drift and rain-on-snow for the site |
| Wind and flood | ASCE 7 wind speed and exposure; flood zone on the coast |
| Steel | AISC 360 design, connection types and coating system |
Who does what
Codes and plan review, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Filing with the local code official or the DOB
- Engineer of Record approval and PE seal
- Special inspections and local inspections
- Foundations and erection
- Fees and filing
New York
What we do not claim
World Steel holds no New York State or New York City approval and no New York engineering license, and does not file applications. Your Engineer of Record seals the design and your team files it.
New York ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New York contractors
New York contractors: let’s win the next project together
If your next bid involves Uniform Code and NYC codes, World Steel wants to be your long-term, win-win steel partner in New York. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New York project is cut, welded, inspected and packed.
Q&A
What New York buyers ask
Does the Uniform Code apply in New York City?
No. New York City enforces its own construction codes through the Department of Buildings. The Uniform Code applies everywhere else in the state.
Who reviews my plans outside the city?
The city, town, village or county code official, under the Uniform Code. We prepare the steel calculations and drawings for that review.
Can you answer reviewer comments?
Yes. We answer comments on the steel design and revise drawings through your Engineer of Record.
Official sources: NYS Division of Building Standards and Codes · NYC Department of Buildings
New York solutions
Every New York guide
Related pages
Code facts on this page summarize New York practice, the NYS Uniform Code, the NYC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the code official or the Department of Buildings confirm the code and edition in force for your project.
Building in New York?
Send the drawings or the site address, size and use. We set the New York design basis with your Engineer of Record, design or detail the steel to the Uniform Code or the NYC codes and your site’s snow and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.