Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Pennsylvania · UCC

The Pennsylvania Uniform Construction Code for structural steel

Pennsylvania adopts the ICC codes statewide through the Uniform Construction Code, administered by the Department of Labor and Industry. Each municipality chooses to enforce it with its own staff or through a certified third-party agency, and Philadelphia runs its own code program. The structural rules are the same; the plan review route depends on the address.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped through the East Coast ports to your Pennsylvania site.

Inspector walking a line of painted built-up members on the shop floor
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Code
Uniform Construction Code
Based on
ICC codes, including the IBC
Enforced by
Municipalities or third parties
Our part
Code basis on sheet one

Why it matters

Same code, different reviewers

Because the code is statewide, the steel design basis is predictable from Erie to Philadelphia. What changes is who reviews it: a township may use a third-party agency, a city its own department, and Philadelphia its own program and amendments.

We put the code edition, the ASCE 7 loads and the design criteria on the first sheet of the calculations, so your Engineer of Record and the reviewer see the basis at once.

Design basis

What the steel design states

The items we confirm with your Engineer of Record before modeling.

ItemWhat we state
Code editionThe Uniform Construction Code edition in force at permit
SnowGround snow, drift and rain-on-snow for the site
WindASCE 7 basic wind speed, exposure and risk category
SeismicSite class and seismic design category
SteelAISC 360 design, connection types and coating system

Who does what

Code compliance, split clearly

World Steel supplies

  • Steel design or detailing to the stated code basis
  • Calculations and drawings for your engineer’s review
  • Envelope details for the energy code
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Engineer of Record approval and PE seal
  • Plan review with the municipality or agency
  • Inspections on site
  • Foundations and erection
  • The building permit

Pennsylvania

What we do not claim

World Steel holds no Pennsylvania approval and no Pennsylvania engineering license. The design is sealed and submitted by your Engineer of Record.

Pennsylvania ecosystem

Products and solutions behind this guide

Open call · Pennsylvania contractors

Pennsylvania contractors: let’s win the next project together

If your next bid involves Uniform Construction Code, World Steel wants to be your long-term, win-win steel partner in Pennsylvania. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Pennsylvania project is cut, welded, inspected and packed.

Office block of World Steel standing between two fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Reception and lobby of the World Steel head office in Ho Chi Minh City, with the World Steel sign and framed certificates
World Steel head office, 55 Le Thuc Hoach Street, Ho Chi Minh City: where visitors meet our engineers.

Q&A

What Pennsylvania buyers ask

Does every Pennsylvania town use the same code?

Yes, the Uniform Construction Code applies statewide. Who enforces it and how plan review works differ by municipality.

Is Philadelphia different?

Philadelphia administers its own code program with local provisions. Your Engineer of Record confirms them for your site.

Do you provide calculations for plan review?

Yes. We provide the calculations and drawings your Engineer of Record reviews, seals and submits.

Official sources: Pennsylvania Department of Labor and Industry

Pennsylvania solutions

Every Pennsylvania guide

Related pages

Code facts on this page summarize Pennsylvania practice, the Uniform Construction Code, the Philadelphia code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building code official confirm the code and edition in force for your permit.

Building in Pennsylvania?

Send the drawings or the site address, size and use. We set the Pennsylvania design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip from the East Coast port to your site.