North Dakota · Building code
Structural steel and the North Dakota State Building Code
North Dakota requires any city or county that enforces a building code to use the North Dakota State Building Code, based on the IBC, with local amendments allowed. Some rural areas have no local enforcement. We confirm the edition and reviewer for your site before we model.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail for your North Dakota site.
- State code
- IBC based
- Required
- Where a code is enforced
- Rural areas
- Often no review
- Our part
- Code stated on sheet one
Why it matters
One code where there is a code
Fargo, Bismarck and Grand Forks review plans under the state code with their own amendments, while an oil field shop in a rural township may have no local review. Lenders and insurers still usually expect design to the IBC and ASCE 7.
We confirm the edition and reviewer with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code | The North Dakota State Building Code edition and local amendments |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Snow | Ground snow, drift and the roof shape |
| Seismic | Site class and Seismic Design Category |
| Envelope | Girt and purlin details for the adopted energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The permit application
- Engineer of Record approval and PE seal
- Geotechnical report and site class
- Special inspections and local inspections
- Foundations and erection
North Dakota
What we do not claim
World Steel holds no North Dakota approval and no North Dakota engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.
North Dakota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · North Dakota contractors
North Dakota contractors: let’s win the next project together
If your next bid involves State Building Code, World Steel wants to be your long-term, win-win steel partner in North Dakota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your North Dakota project is cut, welded, inspected and packed.
Q&A
What North Dakota buyers ask
Is there a North Dakota state building code?
Yes. Jurisdictions that enforce a code must use it.
What if my site has no local review?
We still design the steel to the IBC and ASCE 7 unless the owner directs otherwise.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise drawings through your Engineer of Record.
Official sources: North Dakota Department of Commerce, Building Codes
North Dakota solutions
Every North Dakota guide
Related pages
Code facts on this page summarize North Dakota practice, the North Dakota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in North Dakota?
Send the drawings or the site address, size and use. We set the North Dakota design basis with your Engineer of Record, design or detail the steel to the North Dakota State Building Code, blizzard drift and deep cold, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail for the truck to your site.