Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Illinois · Food and cold storage

Structural steel for Illinois food plants and cold storage

Chicago is one of the country’s largest food processing centers, and central Illinois turns corn and soybeans into food and ingredients in Decatur, Peoria and beyond. Freezer warehouses, process halls and wet, washed-down rooms all ask more of the steel than a dry warehouse.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Illinois site by rail through the Chicago hub.

Looking up at steel floor beams carrying metal deck
Floor beams and metal deck on a World Steel job in southern Vietnam.
Clusters
Chicago, Decatur, Peoria
Typical build
Freezers and process halls
Steel drivers
Thermal bridges, moisture
Our part
Frames, breaks, coatings

Why it matters

Cold inside, winter outside

In a freezer warehouse every steel member that passes through the insulation is a path for heat and moisture. In a process hall, wash-down water and chemicals attack bare steel. Both need details planned with the frame.

We design thermal breaks, panel supports and connections with the envelope designer, and choose galvanizing or coating systems for the room conditions. We fabricated 1,000 t of phase 1 steel for New Era cold storage.

What we design and fabricate

Steel for food and cold

Thermal breaks

Connections that cut heat paths.

Wash-down coatings

Galvanizing or coatings for wet rooms.

Panel supports

Girts and framing for insulated panels.

Freezer roofs

Roof steel for snow on tall insulated walls.

Who does what

Food plant steel, split clearly

World Steel supplies

  • Frames, girts and panel supports
  • Thermal break details at penetrations
  • Galvanizing or coatings for the rooms
  • Insulated panels if in scope
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Engineer of Record approval and seal
  • Refrigeration and floor heating
  • Food safety finishes and inspections
  • Foundations and erection
  • The permit

Illinois

What we do not claim

We name no food company as a customer and claim no completed Illinois plant. Room conditions and food safety requirements come from the owner and your engineers.

Illinois ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Illinois contractors

Illinois contractors: let’s win the next project together

If your next bid involves food and cold storage, World Steel wants to be your long-term, win-win steel partner in Illinois. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Illinois project is cut, welded, inspected and packed.

Hot-dip galvanized welded steel frames laid on trestles in a fabrication shop
Galvanized welded frames back from the kettle, laid out on trestles in the shop, Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Q&A

What Illinois buyers ask

Can you build freezer warehouses?

Yes. We have fabricated large cold storage steel, including 1,000 t of phase 1 steel for New Era in Vietnam.

Should steel in wash-down rooms be galvanized?

Often. We recommend the system for the room conditions with your engineer and the owner.

Do you supply insulated panels?

Yes, insulated metal panels can be part of the package, coordinated with the frame.

Official sources: Illinois Department of Agriculture

Illinois solutions

Every Illinois guide

Related pages

Code facts on this page summarize Illinois practice, local code adoption, the Chicago Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.

Building in Illinois?

Send the drawings or the site address, size and use. We set the Illinois design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the rail trip to your site.