Steel systems in ASCE 7-22
The systems we design and fabricate most
R reduces the elastic earthquake force in exchange for ductile detailing. Values from ASCE 7-22 Table 12.2-1; the limits by category and height are confirmed for each project.
| System | R | Where it fits in a metal building |
|---|---|---|
| Steel systems not specifically detailed for seismic resistance | 3 | Permitted in SDC A, B and C. Many metal buildings in low and moderate regions use it, designed to AISC 360 without AISC 341 detailing. |
| Ordinary moment frame (OMF) | 3.5 | The usual home for tapered rigid frames in higher categories. In SDC D to F it is limited, with single-story exceptions that cap roof and wall weight. |
| Intermediate moment frame (IMF) | 4.5 | More ductility than an OMF. Moment connections must be prequalified under AISC 358 or qualified by test. |
| Special moment frame (SMF) | 8 | The most ductile frame, for multi-story steel and open fronts in high categories. Prequalified connections and strict member limits. |
| Ordinary concentrically braced frame (OCBF) | 3.25 | Simple braced bays. Limited by height in SDC D and E and generally not permitted in SDC F. |
| Special concentrically braced frame (SCBF) | 6 | Braces that buckle and yield in a controlled way, with gusset plates detailed for it. Used where braced bays must work hard. |
| Eccentrically braced and buckling-restrained braced frames | 8 | For multi-story framing and heavy industrial structures where we fabricate to your Engineer of Record’s design. |
| Steel ordinary cantilever column system | 1.25 | Canopies and light structures. Low R means high design force, and the height limits are tight. |
Metal building practice
How the systems show up in a metal building
Tapered built-up rigid frames
Web-tapered I-sections welded from plate, with bolted end-plate knees. In SDC D to F they are most often designed as ordinary moment frames under AISC 341.
Single-story frame exceptions
ASCE 7-22 lets single-story ordinary and intermediate moment frames go beyond the general limits when the roof and wall weights stay below the code’s caps. Heavy roofs, solar arrays or cranes can rule this out.
Rod, cable and angle bracing
Tension-only rod bracing is efficient for wind. In higher categories the code restricts it and requires brace connections stronger than the brace, so we often switch to angle, HSS or pipe braces.
Portal frames at open walls
Where doors or an open front leave no room for an X-brace, a moment-resisting portal frame carries the longitudinal force instead.
Roof diaphragm and collectors
Roof rod bracing or a steel deck diaphragm gathers the force, and collector struts deliver it to the braced bays. Collectors are designed for the overstrength forces with Ω₀.
Mixed systems
Different systems in each direction are normal. Within one direction, ASCE 7-22 controls how systems combine, and the more restrictive values usually govern.
Choosing the system
How we settle the system with your Engineer of Record
-
Category and height
The Seismic Design Category, eave height and number of stories set which systems are permitted at all.
-
Weights and loads
Roof and wall weights, collateral loads, cranes and mezzanines decide whether the single-story exceptions apply.
-
Openings and use
Doors, open fronts and future expansions decide where braced bays can go and where portal frames are needed.
-
Least steel that passes
We compare the options in SAP2000 and pick the one that meets the code with the least steel and the simplest connections.
Real photos
From our plant in Vietnam
World Steel’s own shop floors and jobs, where the steel for US projects is made. Not stock images.
How World Steel supports this
Designed to US codes, made in our plant in Vietnam
Designed to AISC 341 where triggered
Frames, braces and connections detailed to AISC 341-22 whenever the system and category require it.
Built-up frames from our own plant
Tapered rigid frames welded from plate in our IAS AC472-accredited plant in Vietnam.
Value engineering on the system
We test frame spacing, bracing type and connection layout to cut steel without cutting ductility.
The seismic solution ecosystem
Products and solutions behind this guide
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Products made in our plant in Vietnam
Solutions that come with it
World Steel projects: US codes, Guam, Japan and beyond
3D model
Photo
3D model
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Read the standard behind it
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Related solutions
Questions from US buyers
Force-resisting systems: questions we hear
Can a metal building with tapered frames be used in SDC D?
Yes. Most are designed as ordinary moment frames under AISC 341, within the single-story exceptions in ASCE 7-22. When the weights or height fall outside them, we change the system or add braced frames.
Why not use rod bracing everywhere?
Rods only work in tension and slacken after a large cycle. In higher categories the code restricts that behavior, so members that work in tension and compression are often the better choice.
Can the two directions use different systems?
Yes. A metal building normally uses moment frames across and braced frames along the building, each with its own R, Ω₀ and Cd.
Do you fabricate special moment frames and SCBFs?
Yes, to your Engineer of Record’s design, with the AISC 341 detailing, welding and quality assurance those systems call for. Each project’s scope is confirmed in the quote.
Does World Steel provide shop drawings for seismic work?
Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure, and your Engineer of Record reviews and approves the calculations and drawings.
A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and standards govern, and your Engineer of Record confirms the criteria for each project.
Talk to a seismic engineer
Send the site address, the soil report if you have one, and what the building is for. We confirm the seismic criteria with your Engineer of Record and return a written scope for steel designed to US codes and made in our plant in Vietnam.