Demonstration data
Production
Shop progress by stage, with the holdup flagged
Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.
Demonstration data
Quality
Each inspection attempt kept on file
Every member carries its own quality log: date and result for each stage, the welding procedure applied and every inspection attempt, failed ones and post-repair re-inspections included.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.
Demonstration data
Passport
Scan the label, read the member’s history
The QR label opens a read-only passport with identification, drawings, shop stages, bundle, container and site status. Reading it needs no login, and the code itself stores no data.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.
Demonstration data
3D model
The 3D model, colored by status
The Tekla model marks each member as not delivered, delivered, ready to erect, installed or accepted, and flags any hold or NCR, so the state of the job shows at a glance.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.
Demonstration data
On site
Locate any piece by gridline and elevation
Your erector searches by piece mark, gridline, elevation or QR and sees where the member goes, its erection step, its bundle and container, and the parts it connects to.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.