Kansas · Wind and hail
Structural steel for Kansas wind and hail
Most Kansas sites sit on flat, open land, so ASCE 7 wind is often taken with Exposure C and higher pressures than a sheltered city lot. Western and central Kansas also see frequent large hail and a long tornado season. We design the frames, bracing, girts and door framing for the wind your Engineer of Record sets.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail through Kansas City for your Kansas site.
- Exposure
- Often C, open terrain
- Hail
- Frequent in the west
- Doors
- Framed for wind pressure
- Shelters
- ICC 500 by your team
Why it matters
Wind from every side
A feedyard shed near Dodge City or a warehouse near Salina has nothing to break the wind for kilometers. Large doors left open change the internal pressure, and long roofs collect drift in blizzards, so the steel is checked for each case rather than a single generic load.
We design the lateral system, wall bracing around door openings and anchorage for the site wind, and size purlins and girts for the panel your team selects for hail. Storm shelters follow ICC 500 and are designed by your team; we provide the steel around them.
What we design and fabricate
Steel for storm country
End wall frames
Full end wall frames where the wind and future expansion call for them.
Door framing
Jambs and headers for large doors designed for wind pressure.
Bracing
Roof and wall bracing for the lateral wind load.
Anchorage
Base plates and anchor rods for uplift and shear.
Who does what
Wind design, split clearly
World Steel supplies
- Frames, bracing and girts designed to ASCE 7 for the site
- Door framing sized for the design wind pressure
- Base reactions for the foundation design
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Wind speed, exposure and risk category with the Engineer of Record
- Engineer of Record approval and PE seal
- Foundations and anchor rod installation
- Door, panel and fastener installation
- Erection and site work
Kansas
What we do not claim
No building is storm-proof, and World Steel claims no storm shelter rating. We design the steel to ASCE 7 for the wind your Engineer of Record sets; storm shelters follow their own standard and are designed by your team.
Kansas ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Kansas contractors
Kansas contractors: let’s win the next project together
If your next bid involves plains wind and hail, World Steel wants to be your long-term, win-win steel partner in Kansas. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Kansas project is cut, welded, inspected and packed.
Q&A
What Kansas buyers ask
Is Exposure C always used in Kansas?
Not always. Your Engineer of Record sets exposure from the surrounding terrain; open plains usually mean C.
Do you supply hail-rated roofing?
The roof panel and its hail rating are chosen by your team. We size the purlins and fastening layout to suit it.
Can you design a storm shelter?
Storm shelters follow ICC 500 and are designed by your team. We supply the surrounding building steel.
Official sources: ASCE 7 Hazard Tool
Kansas solutions
Every Kansas guide
Related pages
Code facts on this page summarize Kansas practice, the code your city or county adopts, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Kansas?
Send the drawings or the site address, size and use. We set the Kansas design basis with your Engineer of Record, design or detail the steel to your local code and open-plains wind, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail through Kansas City for the truck to your site.