Idaho · Potatoes
Structural steel for Idaho potato storage and processing plants
Idaho grows about a third of the potatoes in the United States, stores them for months in insulated, ventilated buildings and turns many of them into frozen products in large plants around Idaho Falls, Rupert, Burley and the Magic Valley. We fabricate the storage halls, processing plants and cold room steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Seattle, Tacoma or Portland for your Idaho site.
- Share
- About a third of US potatoes
- Storage
- Insulated, ventilated halls
- Walls
- Framing for pile loads
- Plants
- Frozen food processing
Why it matters
Walls that hold the pile
A potato storage building is filled with a pile several meters deep that pushes on the walls, and the air inside is cool and humid for months. Processing plants beside them run wet, hot and cold rooms in one building.
We frame storage walls for the pile loads your engineer sets, choose coatings for humid storage and washdown rooms, detail thermal breaks and release processing plant steel in phases.
What we design and fabricate
Steel for potato storage and plants
Storage halls
Clear spans with wall framing for bulk pile loads.
Ventilation framing
Openings and supports for air systems.
Humid-air coatings
Galvanized or duplex systems for storage air.
Cold rooms
Frames with thermal breaks for frozen products.
Who does what
Plant steel, split clearly
World Steel supplies
- Process hall, platform and mezzanine steel
- Coating systems chosen for each room
- Phased releases next to running lines
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process layout with the owner and equipment suppliers
- Engineer of Record approval and PE seal
- Food safety and sanitation design
- Equipment setting and piping
- Erection and site work
Idaho
What we do not claim
World Steel names no Idaho food company as a customer and makes no food safety or sanitation claim. Food safety design is the owner’s and their team’s scope.
Idaho ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Idaho contractors
Idaho contractors: let’s win the next project together
If your next bid involves potato storage and processing, World Steel wants to be your long-term, win-win steel partner in Idaho. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Idaho project is cut, welded, inspected and packed.
Q&A
What Idaho buyers ask
Can the walls take pile loads?
Yes. We frame walls for the bulk pile loads your engineer sets.
Which coatings suit storage air?
Galvanizing or duplex systems usually suit the cool, humid air.
Do you supply ventilation systems?
No. Ventilation equipment is your team’s scope; we frame the openings.
Official sources: Idaho Potato Commission
Idaho solutions
Every Idaho guide
Related pages
Code facts on this page summarize Idaho practice, the Idaho Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Idaho?
Send the drawings or the site address, size and use. We set the Idaho design basis with your Engineer of Record, design or detail the steel to the Idaho Building Code, its fault zones and mountain snow, and quote it made in our plant in Vietnam, packed in erection order and delivered through Seattle, Tacoma or Portland to your site.