Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Bermuda steel solutions

Structural steel for large Bermuda projects, from Dockyard to St George’s

Bermuda sits alone in the North Atlantic, about 1,000 km off the US coast, and a CARICOM associate member. Hurricanes such as Fabian, Gonzalo and Paulette cross it at strength, and its builders have always built for the wind. Office buildings in Hamilton, hotels on the south shore, healthcare, schools, the airport and marine buildings make up its steel work. We design and fabricate that steel in our own plant in Vietnam, 2,500 t a month, and ship it packed in erection order to Hamilton.

Quo fata ferunt · Whither the fates carry us

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to Hamilton

Metal floor deck laid on each level of a steel-framed building
Going up beside the plant in Vietnam: World Steel framed its own office building.

Why World Steel

What a large Bermuda project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released floor by floor.

Large-project program →

Hurricane design

Frames, cladding and anchors designed for Atlantic hurricanes, from roof edge to anchor bolt.

Hurricane guide →

Limestone and caves

Foundation reactions and base details for limestone, caves and marsh.

Ground guide →

Ready for permit

Calculations that state the Bermuda Building Code basis for your engineer and the Department of Planning.

Building code guide →

Coated for salt air

Paint systems and galvanizing chosen for an island ringed by the Atlantic.

Coatings guide →

Shipped to Hamilton

Packed in erection order and shipped to the port of Hamilton, with tight city sites in mind.

Port delivery guide →

National symbols of Bermuda

Built with respect for Bermuda

The red ensign, the red lion holding the shield of the wrecked Sea Venture, the white stepped roofs that catch Bermuda’s rain, the native cedar and the longtail. Four symbols, and what each one means for the steel we make for Bermudian buildings.

The red lion and the Sea Venture

The arms show a red lion holding a shield with the wreck of the Sea Venture, the ship that brought the first settlers in 1609. Built to survive the storm, like every frame we design.

The white stepped roofs

Bermuda’s stepped white roofs catch the rain that every home stores. They are also built for the wind: the load path we design follows the same rule.

The Bermuda cedar

The native cedar built Bermuda’s ships and houses. Today steel takes the long spans, coated for the salt air the cedar once resisted.

The longtail

The white-tailed tropicbird returns to the cliffs every spring. It nests on the edge of the sea, where we choose our strongest coatings.

Nine parishes, one island chain

Pick your parish. Each one has its own steel page.

Bermuda has nine parishes along its hook of islands: Sandys and Southampton in the west, with Dockyard and the south shore hotels; Warwick, Paget, Pembroke with the City of Hamilton, and Devonshire in the centre; and Smith’s, Hamilton Parish and St George’s in the east, with the airport and the old town. Each page covers the main settlement, the ground, the hurricane and salt conditions, the road from Hamilton and the steel we recommend for what gets built there.

The west endThe centreThe east end

The west end

Sandys and Southampton: the Royal Naval Dockyard, Somerset and the south shore beaches.

The centre

Warwick, Paget, Pembroke with the City of Hamilton, and Devonshire: offices, the hospital, homes and the main port.

The east end

Smith’s, Hamilton Parish and St George’s: Harrington Sound, the airport and the old Town of St George.

Project types

What Bermuda builds in steel, and where

The four project types behind most steel orders on the island, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Red multi-story process tower frame next to a feed mill

Hotels and resorts

South shore, Southampton, Tucker’s Town

Hotel buildings, cottages, restaurants and spa roofs designed for Atlantic wind.

Process tower frame by World Steel in Vinh Long Province, Vietnam.

Tall columns and rafters inside a clear-span building with roof sheeting on

Healthcare, schools and public

Paget, Devonshire, every parish

Hospital and clinic buildings, schools, halls and offices designed to the risk category your engineer sets.

Clear-span interior on a World Steel job in southern Vietnam.

Curved long-span trusses being set during erection

Marine and airport

Dockyard, St George’s, St David’s

Marine and dockyard buildings, boat sheds, hangars and cargo sheds.

Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Buy it all in one place · Bermuda

Everything your project in Bermuda needs in steel, from one desk

Offices and hotels in Hamilton, the airport, warehouses and public buildings. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Hamilton, with every piece tracked live in PEB Studio.

All solutions and products for Bermuda
SupplierWorld Steel, own plant in Vietnam
Port of dischargeHamilton
TermsFOB Vietnam or CIF Hamilton
ErectionYour contractor

Picked for Bermuda

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF Hamilton
  9. Your contractor erectsClearance at Hamilton, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFHamilton, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking Bermudian contractor partners

Bermudian contractors: you win the job, we fabricate the steel

Office buildings in Hamilton, hotels and resorts on the south shore, healthcare, schools, the airport, marine buildings at Dockyard and warehouses near the port are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Hamilton and back your bid with drawings and live tracking.

  • Offices and mixed-use buildings
  • Hotels and resorts
  • Healthcare and schools

Hurricanes, salt air, earthquakes

Steel for Bermuda’s storms and sea

A broad hazard picture for Bermuda and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every Bermuda package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Bermuda.

Gate of the World Steel plant with the office block and two of its fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Labeled stacks of steel plate under a gantry crane
Raw plate stock waiting in the World Steel yard, Vietnam.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Blue-coated frames waiting under the shop crane to be packed
Blue frames waiting their turn in the packing area, Vietnam plant.

Caribbean logistics

Ports for Bermuda: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from Bermudian buyers

Bermuda questions we hear most

Which building rules apply to steel buildings in Bermuda?

Planning permission and building permits go through the Department of Planning, with the Development Applications Board deciding planning applications. The Bermuda Building Code is based on the International Codes, with Bermuda amendments. We state the code basis your engineer of record sets on the first calculation sheet.

Do hurricanes hit Bermuda?

Yes. Fabian in 2003, Gonzalo in 2014, Nicole in 2016, Humberto in 2019, Paulette in 2020 and Ernesto in 2024 all crossed or passed close. We design the whole load path for the wind speed your engineer sets.

Is Bermuda an earthquake zone?

Bermuda sits inside the North American plate, far from plate boundaries, and seismic hazard is low. Your engineer still sets the seismic values from the code and the soil report.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Which port do you ship to?

Hamilton, Bermuda’s commercial port in Pembroke. Dockyard in Sandys is the cruise and marine port.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the parish and the plan. We tell you what Bermuda asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Bermuda and the US standards it references. We hold no approval, licence or registration in Bermuda and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Contact World Steel · Bermuda

Talk to us about steel for Bermuda

WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.