Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long blue metal-clad factory wall built with World Steel panels in Vietnam

Wall & cladding system

Walls that hold their line

Wall panels, insulated metal panels, trims and louvers coordinated with girt spacing and every opening before we cut a sheet. Made in the plant that fabricates 2,500 t of structural steel a month, and packed with the frame they hang on.

Wall panel profile

Panel profiles

Profile

Trapezoidal

The everyday wall sheet for warehouses and plants: stiff ribs, long spans between girts.

Gauge, coating and tested data are confirmed in your quote. Pick another profile in the band above.

Profile

Corrugated

A softer rolling profile for agricultural, heritage-style and architectural walls.

Gauge, coating and tested data are confirmed in your quote. Pick another profile in the band above.

Profile

Flat rib

Small, closely spaced ribs that read as a calm, flat facade for offices and showrooms.

Gauge, coating and tested data are confirmed in your quote. Pick another profile in the band above.

Profile

Insulated panel

Two steel skins around an insulated core for cold rooms, offices and conditioned space.

Gauge, coating and tested data are confirmed in your quote. Pick another profile in the band above.

Coordinated before cutting

Every opening drawn into the wall

A wall is only as tight as its openings and corners. We coordinate girt spacing, framing and trims around each one on the shop drawings.

Doors

Jambs and headers framed with C girts, trims drawn so the door maker’s frame sits square.

Louvers and fans

Openings placed between girts with flashings that shed wind-driven rain.

Windows

Sill and head trims detailed with the window supplier’s rough-opening sizes.

Base and corners

Base trims, corners and wall-to-roof transitions that keep water and pests out.

Facades by
World Steel

Walls on plants, mills and warehouses we have framed and clad. Tap a photo to open it full size.

Aerial view of a clad feed mill with a tall tower and long sheds by World Steel
Feed mill sheds and tower, clad in metal panels
Aerial view of a clad warehouse in an industrial park in Vietnam
Warehouse walls in an industrial park
Warehouse frame being erected with a crane before cladding
The frame before its walls go on

US codes

How we engineer the walls

Wind pressure

Wall end zones carry higher components-and-cladding pressure than the middle of the wall. Panels and screws are chosen from tested capacity data for those zones.

Moisture control

Base trims, sealed laps and flashed penetrations keep wind-driven rain and snowmelt out of the wall.

Thermal performance

Insulated metal panels, or single-skin panels with insulation, chosen to meet the energy code for your climate zone and use.

Connection details

Screw patterns, girt spacing and trim details appear on the shop drawings for your erector.

Coastal durability

Coating and fastener choices follow the exposure review for the site.

Architectural appearance

Panel profiles, colors and trim lines are selected with your architect.

Large-project capacity

Walls for the largest jobs on our books

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

ProjectSectorWhereStructural steel
Sunpro Steel FactorySteel industryCan Tho City, Vietnam · 20245,000 t
CPV Food Processing FactoryFood processingDong Nai Province, Vietnam · 20202,500 t
Long Son petrochemicalOil and gasBa Ria–Vung Tau, Vietnam · 20222,000 t
M&D warehouse, ThailandWarehouse and industrialThailand · 20242,000 t
Tongwei feed factory, phase 1Animal feedDong Thap Province, Vietnam · 20181,500 t
New Era cold storage, phase 1Cold storage, phase 1 tonnageTay Ninh Province, Vietnam1,000 t

In the catalog

Wall and cladding items in the catalog

Finished steel building in blue wall panels with a walk-in door Photo

Metal Wall Cladding

Profiled steel wall sheets, metallic-coated and factory painted, screwed to the girts as the outside skin of the building. Made by World Steel in Vietnam Verified
Drawn illustration of wall & cladding system, standing in for a photo of this product Illustration

Insulated Metal Panels

Wall panels with steel skins on both faces of an insulating core, giving the exterior finish and the thermal layer in one piece. Made by World Steel in Vietnam Verified
Finished warehouse in white wall panels with sectional doors along one side Photo

Single-Skin Wall Panels

A single layer of profiled steel sheeting for walls of unheated buildings, canopies, sheds and screens. Made by World Steel in Vietnam Verified
Drawn illustration of wall & cladding system, standing in for a photo of this product Illustration

Wall Insulation

Fiberglass or mineral wool fitted behind the wall sheets to meet the energy code for your climate zone. Made by World Steel in Vietnam Verified
Drawn illustration of wall & cladding system, standing in for a photo of this product Illustration

Wall Flashings

Formed trims that close the top, bottom and edges of wall panels and seal around doors and windows. Made by World Steel in Vietnam Verified
Drawn illustration of wall & cladding system, standing in for a photo of this product Illustration

Corner Trims

Formed steel covers for outside and inside corners and exposed panel edges. Made by World Steel in Vietnam Verified
Drawn illustration of wall & cladding system, standing in for a photo of this product Illustration

Louvers

Fixed-blade wall louvers that let air in or out while shedding most of the rain. Made by World Steel in Vietnam Verified
Drawn illustration of wall & cladding system, standing in for a photo of this product Illustration

Ventilation Openings

Wall openings framed in the steel design to take louvers, fans or vents. Made by World Steel in Vietnam Verified
Drawn illustration of wall & cladding system, standing in for a photo of this product Illustration

Wall Accessories

The small items that finish a wall: foam closures, sealant tapes and self-drilling screws matched to the panels. Made by World Steel in Vietnam Verified

Where it meets the other systems

Secondary Framing

Wall sheets screw to the girts and finish at a base trim along the edge of the slab.

Design limit: The panel’s tested capacity sets the maximum girt spacing, and the wall end zones usually decide it. · What gets checked: Check the screw pattern and that side laps are sealed.

Insulation & Building Performance

Wall insulation goes behind the wall sheets, unless insulated metal panels are used instead.

Design limit: Screw length and trim depth follow the insulation thickness, the same as on the roof. · What gets checked: Insulation and vapor retarder run unbroken around doors, windows and louvers.

Doors & Building Openings

Jamb, head and sill trims close the cut edges of the wall panels around each opening.

Design limit: Trim profiles are agreed with the door manufacturer so the door seals land on a flat surface. · What gets checked: Hose test the openings where the specification calls for it.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Wall panel and fastener selection from tested capacity data for each wall zone
  • Wall panels, insulated panels, trims, flashings and louvers made in our plant
  • Shop drawings with girt spacing, screw patterns and every opening trim, at no extra cost
  • Panels cut to length and bundled by elevation for your US port

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Panel installation by your crew, following the elevation drawings
  • Final color and profile approval with your architect
  • Doors and windows by their makers, set into the framed openings

Questions from US contractors

Wall and cladding questions and answers

6 answers, grouped by topic.

Panels 3 answers

Which wall panel profiles can you supply?

Trapezoidal, corrugated, flat-rib and insulated metal panels are the usual choices. The exact profile, gauge, coating and tested data are confirmed in your quote.

Can the walls match an architect’s color scheme?

Panel profiles, colors and trim lines are selected with your architect. Ask for the current color range when you send the elevations.

Are insulated metal panels available?

Yes, for walls that need the energy code values of a conditioned or cold building. The required thermal values come from your design team.

Openings and details 2 answers

Who frames the door and window openings?

We do, in the steel design. Jambs, headers and trims are drawn to the door and window makers’ sizes, so the openings arrive ready for their frames.

How do you keep wind-driven rain out of the wall?

With base trims, sealed laps and flashed penetrations shown on the shop drawings. Most wall leaks start at openings and transitions, so those are detailed first.

Large projects 1 answer

Can you clad a large industrial complex?

Yes. Walls come from the same plant that fabricates 2,500 t of structural steel a month and has framed jobs up to about 5,000 t, so panels ship in step with the frames.

Keep reading

Related pages

Price it or partner with us

Send the elevations.

We coordinate panels, girts and every opening on the shop drawings, and pack each elevation for your crew.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Have this system engineered for your site

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details