Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Mississippi · Data centers

Structural steel for Mississippi data center campuses

Central Mississippi, around Madison County and Meridian, has drawn some of the largest data center investments in the South, with campuses built hall by hall. Each hall repeats the frames, mezzanines and roof plant steel of the last. We fabricate them as phased releases.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Mobile or New Orleans for your Mississippi site.

Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.
Hubs
Madison County, Meridian
Pattern
Repeat halls
Key steel
Roof plant platforms
Release
Hall by hall

Why it matters

Repeat halls, fast phases

A data campus repeats the same hall many times, with electrical galleries, mezzanines and heavy roof plant for cooling. The schedule depends on releasing the next hall while the last is erected.

We keep repeat drawings, pack each hall in erection order and track every member in PEB Studio, so the site in Madison County sees what ships next.

What we design and fabricate

Steel for data halls

Hall frames

Long-span frames that repeat from hall to hall.

Mezzanines and decks

Electrical rooms and galleries on composite or steel deck.

Roof plant steel

Platforms and screens for cooling units.

Cable and duct supports

Tray, duct and equipment support steel by system.

Who does what

Data campus steel, split clearly

World Steel supplies

  • Hall frames, mezzanines and roof plant steel
  • Repeat drawings and phased releases
  • Steel packed in erection order by hall
  • Live production tracking in PEB Studio
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Campus design with the owner’s Engineer of Record
  • Engineer of Record approval and PE seal
  • Foundations, slabs and utilities
  • Mechanical, electrical and controls
  • Erection and site work

Mississippi

What we do not claim

World Steel names no Mississippi data center owner as a customer and claims no completed Mississippi project. Photos show World Steel projects abroad and our plant in Vietnam.

Mississippi ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Mississippi contractors

Mississippi contractors: let’s win the next project together

If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Mississippi. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Mississippi project is cut, welded, inspected and packed.

Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Two welders operating a submerged-arc welding station on a member
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.

Q&A

What Mississippi buyers ask

Can you repeat a hall design?

Yes. We keep repeat drawings and release hall by hall.

Do you supply roof plant steel?

Yes. Platforms, screens and supports for cooling units are part of the package.

Do you name data center owners?

No. World Steel names no company as a customer on this site.

Official sources: Mississippi Development Authority

Mississippi solutions

Every Mississippi guide

Related pages

Code facts on this page summarize Mississippi practice, the code your county or city enforces, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Mississippi?

Send the drawings or the site address, size and use. We set the Mississippi design basis with your Engineer of Record, design or detail the steel to your county’s code and Gulf hurricane wind, and quote it made in our plant in Vietnam, packed in erection order and landed at Mobile or New Orleans for the truck to your site.