Washington, DC · Multi-story
Structural steel for Washington, DC mid-rise buildings
The federal Height of Buildings Act keeps DC buildings to roughly the width of the street they face, so the city builds wide mid-rise offices, hotels, labs and mixed-use buildings that fill their lots. Steel frames with composite floors, transfer steel over podiums and braced cores suit them well. We fabricate that steel floor by floor.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore for your Washington, DC site.
- Limit
- Height Act
- Shape
- Wide mid-rise
- Floors
- Composite on deck
- Release
- Floor by floor
Why it matters
Low skyline, deep floors
With height capped, every floor counts, so floor depth, penthouse steel and transfer girders over retail podiums matter. Conversions of older offices add new steel inside existing buildings.
We fabricate columns, beams, transfer girders, bracing and deck and ship them floor by floor in erection order, coated ready for fire protection.
What we design and fabricate
Steel for multi-story buildings
Frames and floors
Columns, beams and composite floors on metal deck.
Lateral systems
Braced or moment frames for wind and seismic loads.
Stairs and cores
Steel stairs and core framing.
Fire protection
Steel ready for the fire-resistance design.
Who does what
Multi-story steel, split clearly
World Steel supplies
- Columns, beams, bracing and deck
- Floor-by-floor releases packed in erection order
- Coating ready for fire protection
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Architecture and the Engineer of Record’s design
- Engineer of Record approval and PE seal
- Fire protection and inspections
- Concrete topping and MEP
- Erection and site work
Washington, DC
What we do not claim
World Steel names no Washington, DC developer as a customer and claims no completed Washington, DC building. Fire protection and inspections are your team’s scope.
Washington, DC ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Washington, DC contractors
Washington, DC contractors: let’s win the next project together
If your next bid involves mid-rise frames, World Steel wants to be your long-term, win-win steel partner in Washington, DC. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Washington, DC project is cut, welded, inspected and packed.
Q&A
What Washington, DC buyers ask
Can you supply transfer girders?
Yes. Built-up transfer girders are part of what we fabricate.
Can you work on office conversions?
Yes. We detail new steel to your survey of the existing building.
Do you supply fireproofing?
No. Fire protection is your team’s scope; the steel is coated ready for it.
Official sources: National Capital Planning Commission
Washington, DC solutions
Every Washington, DC guide
Related pages
Code facts on this page summarize Washington, DC practice, the DC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Washington, DC?
Send the drawings or the site address, size and use. We set the Washington, DC design basis with your Engineer of Record, design or detail the steel to the DC Construction Codes, and quote it made in our plant in Vietnam, packed in erection order and delivered through Baltimore to your site.