Getting people up to the deck

Stair towers and ramps, made with the span

A footbridge is only as useful as the way up to it. We fabricate stair towers, accessible ramps, landings and elevator frames in the same program as the span, from the same model, so the deck, the landings and the bearing seats meet at the same level on the first lift.

Deck level Span Stair tower Ramp 1:12 landing continues
Diagram, not to scale. A 1:12 ramp runs about 12 m for every metre of rise, so it is broken here. Slopes and landings are set by your designer.

Three ways up

Stair, ramp or elevator frame

Most bridges use a stair at one end and a ramp or an elevator at the other. All three come off the same model as the span.

Stair tower

Switchback flights round four posts. The smallest footprint, so it suits tight corners next to a road.

  • Small footprint
  • Landing at every flight
  • Can carry the span bearing

Ramp

Long, gentle runs with level landings, for wheelchairs, strollers and bikes. Needs the most ground.

  • Gentle slope
  • Level landings
  • Handrails both sides

Elevator frame

Shaft steel beside the stair, framed to the elevator supplier’s reactions. The owner adds the lift.

  • Shaft steel
  • Machine beams
  • Rail brackets

Related products: stairs, external stairs, guardrails and handrails.

The kit

What a stair tower is made of

Stringers

Channel or plate stringers, drilled for treads and guard posts.

Treads and landings

Grating or checker plate, drained and slip resistant.

Posts and bracing

Tower posts with base plates and bolted bracing.

Guards

Bolt-on guard and handrail panels with toe plates.

Bridge seat

The bearing seat where the span lands on the tower.

Coating

Galvanized or painted to match the span.

Piece marks

Every flight and frame marked to the erection set.

Flat pack

Flights and frames bundled flat, not shipped as tall boxes.

Before we draw

Eight things to settle at each landing

Your designer sets the slopes, risers, guards and clearances. With these settled, we draw the tower or ramp and the span together.

What drawings you receive
  • Deck level and clearance under the span confirmed
  • Ramp slope and landing lengths set by your designer
  • Riser and tread sizes set by your designer
  • Guard height, infill spacing and handrail sizes set
  • Tread and landing surface chosen for wet weather
  • Drainage at landings and the foot of each flight
  • Elevator supplier and reactions known, if any
  • Foundations and anchor bolt layout by others

Who does what

We supply the steel. Your team builds the way up.

World Steel

  • Stair tower, ramp and landing steel
  • Guards, handrails and toe plates
  • Elevator shaft and machine beam steel
  • Treads, grating and checker plate
  • Shop, approval and erection drawings
  • Coating, packing and shipping

Your project team

  • Foundations and anchor bolts
  • Elevator equipment and its installer
  • Lighting, canopies and finishes
  • Erection, by the US contractor, our customer
  • Accessibility review and permits
  • Seal of the Engineer of Record

From our jobs and shop

Towers, posts and frames we have made

Steel stair tower attached to the side of a multi-story frame
Row of columns ending in drilled square base plates
Finished columns with base plates resting on shop rails
Galvanized steel frames with punched bolt plates at the corners on shop trestles

Questions

Stairs and ramps for footbridges

Do you fabricate the stair towers for a pedestrian bridge?

Yes. Stair towers, ramps, landings, guards and elevator support frames are fabricated with the span, from the same model, and shipped in the same program.

What slope do you use for an accessible ramp?

The slope your designer sets. In the US a running slope of no more than 1:12 with level landings is common, but the designer of record applies the accessibility rules for your site.

Can the stair tower carry the bridge?

Often, yes. The tower can include the bearing seat for the span, so tower and bridge are designed together and their levels match on site.

Do you supply elevators?

No. We fabricate the shaft steel, machine beams and rail brackets to the elevator supplier’s reactions. The elevator equipment and its installation are by others.

How are stairs shipped?

Flat: stringers, landing frames and posts are bundled and bolt together on site, which keeps freight volume low.

Planning the way up to your bridge?

Send the deck level, the space you have at each end and any elevator plans. We draw the tower or ramp with the span.