Plant output
2,500 t / month
About 2,750 short tons of structural steel, IAS AC472 plant in Vietnam
Your role, your problems
The problems we hear most, and our answer to each
Bids you cannot compare
Every supplier draws the scope line in a different place.
Who is this supplier?
An overseas fabricator has to prove its credentials.
Unclear delivery terms
Who imports, who clears and where risk passes.
- Line-item scopeInclusions and exclusions listed item by item.
- Incoterm namedDelivery point, importer of record and risk transfer stated.
- Checkable credentialsCertificate numbers and links to the issuing bodies.
- Clarifications before awardCommercial and technical questions answered in writing.
Bid leveling
Scope leveling, made easy
How a World Steel quote reads next to a typical steel offer. The lines are what matter, not the totals.
Scope leveling, made easy
| Scope line | World Steel quote | Typical steel offer |
|---|---|---|
| Primary and secondary steel | Included | Included |
| Roof and wall envelope, trims | Included | Often separate |
| Shop drawings | Included | Often extra |
| Design calculations for EOR review | Included | Varies |
| Anchor rods | Stated per quote | Often unclear |
| Incoterm and importer of record | Named | Often unstated |
| Manufacturing Data Record | Included | Rarely |
Check us yourself
Request a quotation · Procurement Managers
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Request an itemized quoteYour scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that procurement managers use most, each with its own page to read before you call.
Ecosystem for Procurement Managers
Photo
Photo
Photo
Photo
Engineering guides
- Complete Building SolutionsFrame, envelope and openings engineered as one US-code building.
- Value EngineeringLeaner steel options, decided by your Engineer of Record
How we work
- Packing & shippingBundled in erection sequence, documented for US customs and shipped to West, Gulf or East Coast ports.
- Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
- Project managementA named project manager, scheduled reports and one point of contact from contract to final delivery.
Buildings to look at
- NYT WarehouseUnited States
Photo
- RailingUnited States · 2019
Illustration
- Hope ValleyAustralia
Photo
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What procurement managers ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
How is a World Steel quote laid out?
Line by line: each system, component and service with its inclusions and exclusions, the Incoterm, the delivery point and the importer of record.
Which Incoterms do you offer?
The Incoterm is agreed per offer, for example FOB Vietnam or CIF or DAP to a US port. The offer names who acts as importer of record.
How can we verify your certificates?
Each certificate shows its number and the issuing body. IAS AC472 can be checked in the IAS public directory.
Do you supply vendor registration documents?
Yes. Company profile, certificates and banking details are supplied on request.
Do you publish prices?
No. Every package is engineered and quoted on its own scope.
What capacity can we plan with?
About 2,500 metric tons of structural steel a month, with several projects in parallel and the production slot confirmed in the quote.
Similar roles
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.