New Hampshire · Building code
Structural steel and the New Hampshire State Building Code
New Hampshire adopts the ICC codes statewide with state amendments through its Building Code Review Board. Towns with building departments enforce the code; in many small towns without an inspector, the State Fire Marshal’s office handles enforcement for certain buildings. We confirm the edition and review path before we model.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New York or Boston for your New Hampshire site.
- Statewide code
- ICC codes, state amendments
- Adopted by
- Building Code Review Board
- Enforced by
- Towns or State Fire Marshal
- Our part
- Code stated on sheet one
Why it matters
Small towns, one state code
Nashua and Manchester have full building departments, while a resort building in a small North Country town may be reviewed through the State Fire Marshal’s office. The code is the same; the review path is not.
We confirm the edition and review path with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code | The New Hampshire State Building Code edition with state amendments |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Snow | Ground snow, drift and the roof shape |
| Seismic | Site class and Seismic Design Category |
| Envelope | Girt and purlin details for the adopted energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The permit application
- Engineer of Record approval and PE seal
- Geotechnical report and site class
- Special inspections and local inspections
- Foundations and erection
New Hampshire
What we do not claim
World Steel holds no New Hampshire approval and no New Hampshire engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.
New Hampshire ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Hampshire contractors
New Hampshire contractors: let’s win the next project together
If your next bid involves State Building Code, World Steel wants to be your long-term, win-win steel partner in New Hampshire. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Hampshire project is cut, welded, inspected and packed.
Q&A
What New Hampshire buyers ask
Does every town use the same code?
Yes. The state code applies statewide; enforcement depends on the town.
Who reviews in a town without an inspector?
The State Fire Marshal’s office covers certain buildings. We confirm it early.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise drawings through your Engineer of Record.
Official sources: New Hampshire State Fire Marshal
New Hampshire solutions
Every New Hampshire guide
Related pages
Code facts on this page summarize New Hampshire practice, the New Hampshire State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Hampshire?
Send the drawings or the site address, size and use. We set the New Hampshire design basis with your Engineer of Record, design or detail the steel to the New Hampshire State Building Code, mountain snow and seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered through New York or Boston to your site.