- Location
- Thailand
- Building type
- Warehouse
- Year
- 2023
- Footprint
- 50 m × 140 m (164 ft × 459 ft) · about 7,000 m² (75,300 sq ft)
Project overview
About Warehouse 50×140
Warehouse 50×140 is a 2023 Thai warehouse with a footprint of 50 by 140 m, roughly 164 by 459 ft and about 75,000 sq ft under one roof. In the US, buildings of this size typically serve regional distribution, manufacturing or bulk storage, and the steel package is large enough that fabrication accuracy and shipping organization directly affect field productivity.
World Steel addresses that by detailing every member in Tekla Structures, assigning piece marks that match the erection drawings and loading steel by sequence so crews are not searching through bundles. Design follows IBC 2024, ASCE 7-22 and AISC 360 unless your Engineer of Record sets another basis. Send your building program for a review and quote.
A 50 m by 140 m warehouse covers about 7,000 m² (75,300 sq ft). US buildings of this size often need fire separation and egress planning that affect the wall and roof layout, and the frame is detailed around those openings.
Gallery
Warehouse 50×140 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 50×140 by the numbers
Footprint
About 7,000 m² (75,350 sq ft) of footprint, roughly 1.3 times a US football field with end zones.
It is 50 m (164 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.
By footprint it ranks 4th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 50×140 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 50×140 in 2023, together with 21 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2024
Warehouse 12×24 & Warehouse 12×18
Warehouse
Photo
Thailand · 2020
ASEAN Warehouse
Warehouse
Photo
Thailand · 2024
Warehouse 36×114
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.