- Location
- Thailand
- Building type
- Warehouse
- Year
- 2023
- Footprint
- 16 m × 50 m (52 ft × 164 ft) · about 800 m² (8,600 sq ft)
Project overview
About Warehouse 16×50
Warehouse 16×50, supplied to Thailand in 2023, is a narrow building of 16 by 50 m, roughly 52 by 164 ft and about 8,600 sq ft. Long, slim footprints like this are common across rural America for equipment storage, hay and feed buildings, and workshops placed along a property line or access road.
A narrow span generally needs lighter frames, so the steel package stays modest and easy to handle with smaller lifting equipment on site. World Steel designs the building for your local loads under ASCE 7-22, supplies anchor bolt plans and erection drawings, and ships the kit marked piece by piece. Send your dimensions and county or city to request a quote.
A 16 m (52 ft) span is narrow enough for light rafters and simple connections. US self-storage buildings, covered parking and small workshops often use spans in this range, where cold-formed purlins and girts make up much of the steel.
Gallery
Warehouse 16×50 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 16×50 by the numbers
Footprint
About 800 m² (8,610 sq ft) of footprint, about 15% of a US football field with end zones.
It is 16 m (52 ft) wide. A width under 20 m is usually one clear span, the size of many US shops, storage sheds and small warehouses.
By footprint it ranks 22nd of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 16×50 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 16×50 in 2023, together with 21 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand
Warehouse 25×80
Warehouse
Photo
Thailand · 2020
HDD Warehouse
Warehouse
Photo
Thailand
Warehouse 26×49
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.