Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the World Steel Group Steel Structure Factory

Aerial photo, World Steel project archive.

Tay Ninh Province, Vietnam

World Steel Group Steel Structure Factory Structural steel for a factory in Vietnam

World Steel's 2016 factory building in Tay Ninh Province, Vietnam. A reference for long-bay industrial buildings where future expansion has to be planned from day one.

Location
Tay Ninh Province, Vietnam
Building type
Factory
Year
2016
Next step Plan a similar building →

Project overview

About World Steel Group Steel Structure Factory

In 2016 World Steel completed its own steel structure factory in Tay Ninh Province, Vietnam, building the plant with the same design and fabrication methods it offers clients. A company that houses its own production in a steel building it engineered has a direct stake in the result, since any weakness in the frame would show up in its daily operations.

US buyers often ask where their steel will come from and who stands behind it. World Steel USA is the US-market brand of World Steel Group, and US orders are engineered and fabricated in the group’s IAS AC472-accredited factory in Vietnam, then shipped to US ports. Ask us for the accreditation details and a walkthrough of our quality process.

This is World Steel's own fabrication plant in Tay Ninh Province, where US orders are built. It runs to a capacity of 2,500 tonnes a month and holds IAS AC472 accreditation. US customers can visit and watch their steel being fabricated.

In context

World Steel Group Steel Structure Factory by the numbers

In the portfolio

World Steel Group Steel Structure Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

Supplied in 2016, the only project on this site from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.