Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Omakase Car Park Building D, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Omakase Car Park Building D Structural steel for a car park in Thailand

A car park structure in Thailand (2022). Structured parking in steel is a growing package for US hospitals, campuses and mixed-use developments.

Location
Thailand
Building type
Car park
Year
2022
Next step Plan a similar building →

Project overview

About Omakase Car Park Building D

Omakase Car Park Building D is a steel car park in Thailand that World Steel designed, fabricated and supplied in 2022. Parking structures are a different discipline from single-story sheds: they involve multiple decks, repeated bays, vehicle loads and ramps, so the steel package depends on consistent connection detailing across many nearly identical members and on careful sequencing at the site.

In the United States, a steel parking garage is designed for the live loads in ASCE 7-22 and the provisions of IBC 2024, with AISC 360 governing member and connection design unless your Engineer of Record directs otherwise. Deck, fire protection and corrosion strategy are set by your design team. If you are weighing steel against precast for a garage, send the layout and we will prepare a steel option.

Steel parking structures are lighter than concrete, which means smaller foundations, and they can be erected quickly. In the US, open parking garages are their own IBC occupancy, and the design must handle vehicle barrier loads and corrosion from de-icing salts in colder states.

In context

Omakase Car Park Building D by the numbers

In the portfolio

Omakase Car Park Building D is one of 1 car parks in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Omakase Car Park Building D in 2022, together with 12 other projects shown here from that year.

Design points

What a car park needs from its steel

General points for every car park, not specific to this one.

Exposed framing

Open parking structures see rain, snow and de-icing salt, so protection is chosen for that exposure.

Learn more →

Vehicle loads

Every deck carries moving vehicles, so framing is checked for vibration and deflection as well as strength.

Learn more →

Drainage on each level

Slopes and drains keep meltwater and rain from standing on decks and connections.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Car park. Steel structure design, fabrication and supply by World Steel.

Planning a car park in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.