Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the JSB Warehouse 28×76, Thailand on site

Site photo, World Steel project archive.

Thailand

JSB Warehouse 28×76 Structural steel for a warehouse in Thailand

This 2023 project is a steel warehouse in Thailand. The project name gives its plan size as 28 × 76. It is an example of the plain, repeatable warehouse format that is simplest to fabricate and ship.

Location
Thailand
Building type
Warehouse
Year
2023
Footprint
28 m × 76 m (92 ft × 249 ft) · about 2,128 m² (22,900 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About JSB Warehouse 28×76

World Steel engineered and supplied the steel frame for JSB Warehouse, completed in Thailand in 2023. The project name records a footprint of 28 × 76 m, which works out to roughly 92 by 249 ft, or close to 22,900 sq ft under one roof. That is a size many US distributors, contractor yards and light manufacturers build every year, so the job is a fair benchmark for a mid-size storage building.

For a US warehouse of similar proportions, we start from the loads your site demands under IBC 2024 and ASCE 7-22, or the basis your Engineer of Record selects, and design the frames, purlins and girts to AISC 360 and AISI S100. The steel arrives sorted by erection sequence with piece-marked drawings, so your erector can stand the frames without guesswork. Send a plan and site address to start.

A 28 m by 76 m warehouse is about 2,130 m² (22,900 sq ft). In the US, a building this size is often a contractor's or distributor's first owned warehouse, and it is usually designed so it can be extended by adding bays at one end.

In context

JSB Warehouse 28×76 by the numbers

Footprint

About 2,128 m² (22,910 sq ft) of footprint, about 40% of a US football field with end zones.

It is 28 m (92 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.

By footprint it ranks 15th of the 26 warehouses on this site with published dimensions.

In the portfolio

JSB Warehouse 28×76 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied JSB Warehouse 28×76 in 2023, together with 21 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.