Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Pathumtani Warehouse, Thailand on site

Site photo, World Steel project archive.

Pathumtani, Thailand

Pathumtani Warehouse Structural steel for a warehouse in Thailand

This 2020 project is a steel warehouse in Pathumtani, Thailand. Built in an industrial province outside Bangkok, a close match for US warehouses in suburban logistics parks.

Location
Pathumtani, Thailand
Building type
Warehouse
Year
2020
Next step Plan a similar building →

Project overview

About Pathumtani Warehouse

This warehouse in Pathumtani, Thailand, was completed in 2020 with World Steel supplying the engineered steel structure. Pathumtani is the location named in the project record, and the job sits among the many storage buildings World Steel has supplied in that country, each one designed, fabricated and packed for a local crew to assemble.

For a US distribution or storage project, the lesson is that a warehouse frame can be engineered and fabricated abroad, then put together by a local crew working from clear drawings. We produce those drawings with piece marks and erection sequences, and we design to IBC 2024 and ASCE 7-22 unless your Engineer of Record directs otherwise. Send your project details to begin.

Pathum Thani, just north of Bangkok, is a low-lying province with major industrial estates. Flat, flood-prone land affects foundations and floor levels more than the steel, but it also sets the eave height and door positions, much as in parts of coastal Texas and Louisiana.

In context

Pathumtani Warehouse by the numbers

In the portfolio

Pathumtani Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Pathumtani Warehouse in 2020, together with 26 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.