Interlink Factory Structural steel for a factory in Thailand

This 2020 project is a factory building in Thailand. A factory built around its production line, the same layout-first approach US manufacturing owners take.

Location
Thailand
Building type
Factory
Year
2020
Next step Plan a similar building →

Project overview

About Interlink Factory

Interlink Factory is a 2020 industrial project in Thailand for which World Steel supplied the engineered steel structure. Factory buildings usually combine a large production hall with offices, loading areas and sometimes mezzanines, so a factory steel package often covers several framing systems that have to meet cleanly where they join, both on paper and in the field.

A US light manufacturer planning a new plant will recognize that mix. We design each part to AISC 360 or AISI S100 as appropriate, under IBC 2024 and ASCE 7-22 unless your Engineer of Record chooses otherwise, and detail the connections between them in a single Tekla model. One supplier for the whole frame simplifies coordination for your contractor. Send floor plans to start.

Interlink is a factory supplied in 2020. Factories often run cranes along the bay, and crane runway beams and brackets have their own fatigue and deflection limits; if a US plant needs cranes, World Steel designs the runways with the main frame.

In context

Interlink Factory by the numbers

In the portfolio

Interlink Factory is one of 33 factories in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Interlink Factory in 2020, together with 26 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.