- Location
- Kampot, Cambodia
- Building type
- Warehouse
Project overview
About ASRS + Intake Kampot
ASRS + Intake Kampot in Kampot, Cambodia, is a warehouse project built around an automated storage and retrieval system, with steel supplied by World Steel. Automated warehouses tend to be tall, and the building has to work alongside the storage equipment inside it.
US distribution and cold-chain operators are adding automated storage quickly. Coordination between the building frame and the system supplier is a general design point, covering clearances, deflection limits and loads, and your Engineer of Record sets those criteria. We coordinate through BIM/IFC models with your system vendor and fabricate to the agreed tolerances. Share your automation layout.
Automated storage and retrieval systems (ASRS) run robot cranes in tall, narrow aisles, which need a level floor and a building frame that does not move much under wind. Automated warehouses are a fast-growing part of the US logistics market.
Gallery
ASRS + Intake Kampot images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
ASRS + Intake Kampot by the numbers
In the portfolio
ASRS + Intake Kampot is one of 63 warehouses in the World Steel portfolio on this site, and one of 2 projects listed for Cambodia.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2023
JSB Warehouse 28×76
Warehouse
Photo
Thailand · 2025
Warehouse 38×135
Warehouse
Photo
Hope Valley, Western Australia, Australia
Hope Valley
Warehouse · 350 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.