Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the TPlas Factory, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

TPlas Factory Structural steel for a factory in Thailand

This 2019 project is a factory building in Thailand. Plastics plants carry heavy machine loads and long production lines, the same inputs as US packaging and molding plants.

Location
Thailand
Building type
Factory
Year
2019
Next step Plan a similar building →

Project overview

About TPlas Factory

TPlas Factory is a 2019 industrial project in Thailand, with World Steel responsible for the steel structure’s design, fabrication and supply. Manufacturing buildings of this type usually need tall clear heights, generous bays for machines and space for utilities, all of which feed back into how the primary frames and roof members are sized.

A US plant owner can use the project to judge whether an overseas fabricator understands factory buildings, not only simple sheds. We coordinate machine pits, utility routes and hanging loads in a shared BIM model, then hand your Engineer of Record calculations and drawings to review. The code basis is IBC 2024 and ASCE 7-22 unless directed otherwise. Send your layout for a review.

Plastics molding machines are heavy, and some have overhead feed systems and cranes. Production floors like this need the frame to carry hung loads and keep deflection small so machine alignment is not affected.

In context

TPlas Factory by the numbers

In the portfolio

TPlas Factory is one of 33 factories in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied TPlas Factory in 2019, together with 19 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.