- Location
- Guam
- Building type
- Warehouse
- Year
- 2019
- Status
- Completed
Project overview
About UR Warehouse
UR Warehouse was supplied in 2019 for a site in the US territory of Guam, where buildings go through US code review and a US building department. The structure is a pre-engineered steel warehouse, and World Steel handled the design, factory fabrication and export of the complete frame package. It is an early example of the company delivering storage space onto US soil from its Vietnam plant.
A mainland warehouse buyer can expect the same set of deliverables: design calculations, anchor bolt plans, erection drawings with piece marks, and steel bundled by erection sequence in containers or as breakbulk. Your general contractor pours the foundation and your erector assembles the frame. If you are planning storage or distribution space in the US, share the footprint, eave height and location to begin.
Because the steel for UR Warehouse crossed an ocean as one package, nothing could be fabricated on site to cover a missing piece. That is why every World Steel shipment is checked against the erection drawings at packing: each bundle carries its piece marks, and the packing list follows the order the US contractor will set the frame.
Gallery
UR Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
UR Warehouse by the numbers
In the portfolio
UR Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 3 projects listed for Guam.
World Steel supplied UR Warehouse in 2019, together with 19 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Structural design, fabrication and export supply of the steel structure.
More projects
Related projects
Photo
United States · 2024
Addario
Warehouse
Photo
United States · 2019
UR Warehouse 2
Warehouse
Photo
New York, United States
NYT Warehouse
Warehouse · 230 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.