Thailand

Warehouse 36×300M Structural steel for a warehouse in Thailand

World Steel's 2026 steel warehouse in Thailand. The project name gives its plan size as 36 × 300. It is an example of the plain, repeatable warehouse format that is simplest to fabricate and ship.

Location
Thailand
Building type
Warehouse
Year
2026
Footprint
36 m × 300 m (118 ft × 984 ft) · about 10,800 m² (116,300 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About Warehouse 36×300M

Warehouse 36×300M is a 2026 project in Thailand with a footprint of 36 by 300 m, roughly 118 by 984 ft and more than 116,000 sq ft. Length on this scale is typical of US distribution centers and manufacturing halls, and it raises its own design questions, such as where to place expansion joints and how to brace a very long building against wind.

For a US building of similar length, World Steel can coordinate the expansion joint strategy, bracing lines and door layout with your Engineer of Record before fabrication starts. A long frame also means a large shipment, so steel is packed by erection sequence and each bundle is marked to its bay. Send your project size and location to discuss a distribution-scale package.

A building 300 m (984 ft) long has more roof area than most US distribution centers under one ridge line, so roof drainage, gutter breaks and downspout spacing become part of the structural layout rather than an afterthought.

Drawn illustration of warehouse, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Warehouse 36×300M by the numbers

Footprint

About 10,800 m² (116,250 sq ft) of footprint, roughly 2 times a US football field with end zones.

It is 36 m (118 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.

By footprint it ranks 1st of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 36×300M is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Warehouse 36×300M in 2026, together with 6 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.