- Location
- Hai Phong City, Vietnam
- Building type
- Factory
- Year
- 2024
Project overview
About Sheng Long Biotech (Hai Duong) Aquatic Feed Factory
Sheng Long Biotech (Hai Duong) Aquatic Feed Factory, located in Hai Phong City, Vietnam, was completed in 2024 with a World Steel steel structure. It is one of several feed factories the company framed that year, which gives World Steel recent, repeated experience with the building type rather than a single isolated job.
For US aquaculture feed producers, pet food makers and specialty feed mills, recent repeat experience shortens the learning curve on coordination. We take process loads and openings from your equipment supplier, size the steel under AISC 360 and the code basis your Engineer of Record confirms, and issue clear erection drawings. Share your process flow diagram to begin.
Aquatic feed production uses extruders, dryers and coolers that run hot and humid, so the steel inside needs a coating for that environment. US feed and pet food plants face similar process conditions.
Gallery
Sheng Long Biotech (Hai Duong) Aquatic Feed Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Sheng Long Biotech (Hai Duong) Aquatic Feed Factory by the numbers
In the portfolio
Sheng Long Biotech (Hai Duong) Aquatic Feed Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Sheng Long Biotech (Hai Duong) Aquatic Feed Factory in 2024, together with 16 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Quang Ngai Province, Vietnam · 2019
Hoa Phat Factory Project
Factory
Photo
Tay Ninh Province, Vietnam
Tay Ninh AA Corporation Factory
Factory
Photo
Dong Nai Province, Vietnam · 2020
GPPD Energy Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.