Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Drone shot of a curved-roof steel building close to completion

Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Ho Chi Minh City, Vietnam

Tan Uyen Nam Son Factory Structural steel for a factory in Vietnam

A factory building in Ho Chi Minh City, Vietnam, listed in World Steel's portfolio for 2021. An industrial-park factory, the same setting as the US manufacturing parks where contractors build owner-occupied plants.

Location
Ho Chi Minh City, Vietnam
Building type
Factory
Year
2021
Next step Plan a similar building →

Project overview

About Tan Uyen Nam Son Factory

Tan Uyen Nam Son Factory, listed in Ho Chi Minh City, Vietnam, was completed in 2021 with a steel structure designed, fabricated and supplied by World Steel. Factory shells of this kind are often expected to serve more than one production use over their life, so flexible bay layouts and roof capacity are worth considering early in design.

US developers of speculative industrial buildings and owners of multi-tenant flex space face that same question of flexibility. We can propose frame spacing, clear heights and roof load allowances that keep future options open, with every choice approved by your Engineer of Record under IBC 2024 and ASCE 7-22. Send your site plan and target tenants to start.

Factories in Vietnam's southern industrial parks are often built for export manufacturers, who expect the building to meet the standards of their overseas customers. US owners bringing production back home have a similar need for a clean, efficient plant.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Tan Uyen Nam Son Factory by the numbers

In the portfolio

Tan Uyen Nam Son Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

Supplied in 2021, the only project on this site from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.