- Location
- Thailand
- Building type
- Warehouse
- Year
- 2019
Project overview
About Tuatong 2 Warehouse
Tuatong 2 Warehouse is the second storage building delivered under the Tuatong name in Thailand, completed in 2019 with steel engineered, fabricated and supplied by World Steel. Repeat work on a related project is a practical signal for buyers: it shows that a second building went to the same steel supplier as the first.
On US industrial sites, logistics campuses and farms, owners often add a second or third building beside the first. Matching eave heights, roof slopes and wall panels keeps the site consistent, and a supplier who already holds the design data can start from known details. We recheck each new building against the code basis in force, typically IBC 2024 and ASCE 7-22. Ask about phased projects.
Tuatong 2 was supplied in the same year as the first Tuatong warehouse, which suggests an owner adding capacity quickly. For US owners, a supplier that keeps the first building's design on file can turn a second, similar building into a smaller engineering job.
Gallery
Tuatong 2 Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Tuatong 2 Warehouse by the numbers
In the portfolio
Tuatong 2 Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Tuatong 2 Warehouse in 2019, together with 19 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2024
Warehouse 20×36 & Warehouse 20×24
Warehouse
Photo
Thailand
Warehouse 25×42
Warehouse
Photo
Thailand · 2025
Warehouse 38×135
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.