Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Coastal industrial zone with a steel warehouse, seen from the air

World Steel warehouse in a coastal industrial zone abroad, aerial photo.

Lam Dong Province, Vietnam

Bao Loc Showroom Structural steel for a commercial & retail building in Vietnam

A commercial building in Lam Dong Province, Vietnam, listed in World Steel's portfolio. No completion year is published for it. A reference for owners who want a commercial front without the cost of a concrete frame.

Location
Lam Dong Province, Vietnam
Building type
Commercial & retail building
Next step Plan a similar building →

Project overview

About Bao Loc Showroom

World Steel supplied the steel frame for Bao Loc Showroom, a commercial and retail building in Lam Dong Province, Vietnam. Showrooms trade the plain walls of a warehouse for open frontages and a cleaner architectural finish.

In the US, equipment dealers, RV and boat retailers and building supply stores use the same building type. Large storefront openings call for careful framing at the entry wall, a general design point your Engineer of Record will review. We provide calculations, erection drawings and a sequenced steel package for your local contractor. Send your elevations to get a price.

Bao Loc is a highland town in Lam Dong Province, known for tea and coffee. A showroom there needs a wide glazed front with no columns in the way, so the front frame carries the roof over the glass.

Drawn illustration of commercial & retail building, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Bao Loc Showroom by the numbers

In the portfolio

Bao Loc Showroom is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

More commercial and retail buildings:

Design points

What a commercial & retail building needs from its steel

General points for every commercial & retail building, not specific to this one.

Flexible floor plans

Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.

Learn more →

Curb appeal

Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.

Learn more →

Snow and roof steps

Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Commercial & retail building. Steel structure design, fabrication and supply by World Steel.

Planning a commercial & retail building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.