- Location
- Can Tho City, Vietnam
- Building type
- Factory
- Year
- 2023
Project overview
About Hau Giang Number One Beverage Factory
Hau Giang Number One Beverage Factory, listed in Can Tho City, Vietnam, was completed in 2023 with World Steel responsible for the steel structure. Beverage plants usually combine production and bottling lines with large finished-goods warehouses and busy loading docks, which makes them a hybrid of factory and distribution center under one roof.
US bottlers, breweries and beverage brands building new capacity deal with the same hybrid. We plan frame spacing around line layouts and storage racking, coordinate roof loads from process utilities, and design to IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis. Food-safety requirements are set by your process team and regulators. Send your plant layout to begin.
Number One is a well-known Vietnamese drinks brand, and its plant in the Mekong Delta is a wet, low-lying site. Beverage plants need clean, washable interiors and large warehouses for finished goods, as US bottling plants do.
Gallery
Hau Giang Number One Beverage Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Hau Giang Number One Beverage Factory by the numbers
In the portfolio
Hau Giang Number One Beverage Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Hau Giang Number One Beverage Factory in 2023, together with 21 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Hai Phong City, Vietnam · 2020
Hai Duong Tongwei Animal Feed Factory
Factory
Photo
Tay Ninh Province, Vietnam · 2022
Brotex Yarn Manufacturing Factory
Factory
Photo
Can Tho City, Vietnam · 2024
Sunpro Steel Factory
Factory · 5,000 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.