Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Steel Bridge, Singapore in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Singapore

Steel Bridge Structural steel for a steel bridge in Singapore

A steel bridge in Singapore (2020). Bridges and walkways need fabrication tolerances well beyond a standard building, so they show workshop precision.

Location
Singapore
Building type
Steel bridge
Year
2020
Next step Plan a similar building →

Project overview

About Steel Bridge

World Steel fabricated a steel bridge structure in Singapore in 2020. Bridge work involves heavier plate, tighter fit-up and more demanding inspection than a typical metal building, so it is a useful marker of shop capability.

US engineers and contractors with a pedestrian link, utility bridge or plant crossover can look at this as evidence of specialty fabrication, not only pre-engineered buildings. Transportation bridges in the US follow their own owner and agency specifications, so the scope and code basis would be confirmed with your Engineer of Record first. Share your drawings to discuss feasibility.

Singapore's public works follow strict owner specifications for welding, coating and inspection, which makes any bridge there a demanding job. For US pedestrian or utility bridges, the agency specification comes first, and World Steel confirms its welding procedures and inspection plan against it before quoting.

In context

Steel Bridge by the numbers

In the portfolio

Steel Bridge is one of 3 steel bridges in the World Steel portfolio on this site, and one of 3 projects listed for Singapore.

World Steel supplied Steel Bridge in 2020, together with 26 other projects shown here from that year.

More steel bridges:

Design points

What a steel bridge needs from its steel

General points for every steel bridge, not specific to this one.

Weld inspection

Bridge welds see repeated live loads, so inspection is more rigorous than for building welds.

Learn more →

Shop fit-up checks

Splices are checked in the factory so the bridge assembles in the field without reaming or rework.

Learn more →

Protection for the crossing

Bridges over streams, rivers or salted roads get galvanizing or a coating system matched to the exposure.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Steel bridge. Steel structure design, fabrication and supply by World Steel.

Planning a steel bridge in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.